Log in
Forum
Loading...
Topic

Partial credit with v4 substitution

NC-2009 SSc2: Development Density & Community Connectivity
posted by Cindy Quinn on Jul 30, 2019, 6:49 pm

We have a v2009 project that is within...

Last reply: Emily Purcell, Jul 31, 2019, 9:59 am

PCB Waste considered Hazardous Material, not to be tracked?

NC-2009 MRc2: Construction Waste Management
posted by William LaRose on Jul 30, 2019, 4:38 pm

I am tracking demolition waste from several structures that were removed to make room for my current LEED project. These structures contain several reports stating materials such as lead, PCBs,...

Last reply: debra a. lombard, Jul 31, 2019, 9:46 am

Prevention through Design- a Challenge for projects in Europe

Pilot-Credits IPpc93: Prevention through design
posted by Tobias Hutter on Jul 31, 2019, 4:45 am

Hello, we are trying to get this credit done for Projects over here in Europe, but it is very though for us to provide to the USGBC the reuired evidence because our Approach in Germany / Austria...

Prevention through Design- a Challenge for projects in Europe

Pilot-Credits IPpc93: Prevention through design
posted by Jens Glöggler on Jul 31, 2019, 5:26 am

Hello, has anybody done this Pilot Credit in Europe? would be glad to get more Information on how to submit this succesful? thank you, best regards 

Excluding entrance halls from calculations

Hospitality-NC-v4 EQc7: Daylight
posted by Ricardo Sá on Jul 31, 2019, 4:41 am

Dear All,

we are currently certifying an Hospitality project under LEED v4. Typically, the entrance halls of the living rooms are zones where occupancy is not expected (not...

Appliance and Process Water

Hospitality-NC-v4 WEc2: Indoor water use reduction
posted by Ricardo Sá on Jul 31, 2019, 4:24 am

Dear All,

we are currently certifying an Hospitality project under LEED v4. This project includes a laundry area accessible to all building occupants, where some washing machines...

Occupant Comfort Survey

NC-v4 INc1: Innovation
posted by Leanne Conrad on Aug 3, 2017, 4:01 pm

Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey? I want to submit the IN credit with the first construction submittal but don't want to have to...

Last reply: Stephanie Graham, Jul 30, 2019, 10:56 pm

Core and Shell without plumbing

CS-v4 WEp2: Indoor water use reduction
posted by Joann Lee on Nov 8, 2018, 1:06 pm

I would like to confirm that if the developer doesn't install any plumbing fixtures for his core and shell industrial project, this prerequisite is automatically met.  Appreciate your answer in...

Last reply: emily reese moody, Jul 30, 2019, 6:55 pm

Does the independent lab we use need to be accredited for compliance with ISO/IEC Standard 17025?

NC-v4 SSc5: Heat Island Reduction
posted by Ashley O'Neill on Oct 31, 2018, 2:03 pm

Will a testing report be rejected if the lab follows CRRC-1 but is not an ISO/IEC Standard 17025 lab?

Last reply: emily reese moody, Jul 30, 2019, 6:16 pm

Future bus line

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Alicja Bieszyńska on Aug 6, 2014, 10:34 am

Tristan Roberts Technical Director, The Laurentia Project, HPDC LEEDuser Expert 11453 thumbs up November 27, 2015- 3:12 pm Alicja, I don't think so. For this credit I think the lines should be in place. Log in or register to post comments David Hubka Director- Program Development, Rivion LEEDuser Expert 221 thumbs up November 21, 2017- 8:46 pm LEED v4 allows future bus stops to qualify for credit compliance as long as they meet specified criteria. I am currently working with GBCI to get future bus stops to contribute to credit compliance on a v3 project. I'll post the outcome to this forum. Log...

Last reply: emily reese moody, Jul 30, 2019, 6:11 pm