Topic | Recent |
---|---|
Confusion over tileSchools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systemsposted by Crista Shopis on Oct 10, 2014, 2:55 pm
Above in the "Birds Eye View" tab, it says "Resilient flooring, rubber flooring, ceramic tile, and prefinished... Last reply: Tristan Roberts, Dec 16, 2015, 8:14 pm |
|
IEQ 4.6Schools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Stephanie Santiago on Oct 2, 2015, 12:03 pm
Where would joint compound be categorized? I don't believe it needs to be in the low emitting adhesives and... Last reply: Tristan Roberts, Dec 16, 2015, 8:13 pm |
|
EBOM Campus and Performance PeriodsEBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Planposted by Kath Williams on Dec 16, 2015, 12:22 pm
How is the performance period determined when submitting... Last reply: Kimberly Schlaepfer, Dec 16, 2015, 4:06 pm |
|
Historical BuildingNC-2009 EAp2: Minimum Energy Performanceposted by Khaled Fouda on Dec 14, 2015, 11:01 am
I am working on renovating a NYC historical building. per NYC Energy Conservation Code 101.4.2, this project is exempted from meeting the wattage allowance. So per code we don't have to meet... Last reply: Marcus Sheffer, Dec 16, 2015, 11:05 am |
|
feedbackPilot-Credits EApc65: Monitoring based commissioningposted by emily reese moody on Dec 15, 2015, 7:59 pm
There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data. The confusion seemed to be due to the overlap of the tasks for this credit and the... |
|
Bank-Financial InstitutionNC-2009 PIf3: Occupant and Usage Dataposted by Joseph Blanco on May 11, 2015, 3:07 pm
How would I calculate transit occupancy for a bank. They have 13... Last reply: Steve Loppnow, Dec 15, 2015, 4:36 pm |
|
Calculating Daily Average for Transient UsersNC-2009 PIf3: Occupant and Usage Dataposted by Randy Weatherly on May 30, 2015, 4:24 pm
Based on the examples presented on this site, the daily average is based on 365 days a year. Is this correct or should it be based on actual days the facility is open for business? Last reply: Steve Loppnow, Dec 15, 2015, 4:21 pm |
|
Lighting Controls ExemptionEBOM-2009 EAc3.1: Performance measurement - building automation systemposted by Katherine Roth on Sep 11, 2015, 10:10 am
Our project received the following review comment: Last reply: Melissa Kelly, Dec 15, 2015, 3:27 pm |
|
Concrete SR ValuesNC-v4 SSc5: Heat Island Reductionposted by Brian Harris on Dec 11, 2015, 4:38 pm
How are 3 year aged SR values determined for concrete if not available by the manufacturer? And can regular concrete be used which has about a .28 SR value roughly if their is a cleaning program... Last reply: Trista Brown, Dec 14, 2015, 5:20 pm |
|
Future Fit-Out Space & Transients- Table Plf3-3 or Table Pfl3-4Healthcare-v2009 PIf3: Occupant and Usage Dataposted by Catherine Blakemore on Dec 14, 2015, 3:41 pm
My project is an addition with on future being future fit-out space. As directed by... |