Requirement of entryway system

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Yan-Chuan Chen on Nov 24, 2017, 12:37 pm

I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel. Also, pedimat must...

Last reply: Trista Brown, Apr 26, 2018, 6:25 pm

MRp2 ambiguities

EBOM-2009 MRp2: Solid Waste Management Policy
posted by Vincent Dupuy on Apr 13, 2018, 3:36 pm

I have 2 issues with this prerequisite:

1) I understand that the policy should comply with some credit requirements, incuding MRc7 "Solid waste Management - Ongoing consummables", that...

Last reply: Trista Brown, Apr 25, 2018, 7:51 pm

Watersense- Local Equivalents?

NC-v4 WEp2: Indoor water use reduction
posted by Leanne Conrad on Apr 13, 2018, 12:38 pm

Let's talk about watersense and local equivalents. 

What makes a local standard equivalent? If we can meet or beat the flow rates, is there another requirement or feature that we need to...

Last reply: emily reese moody, Apr 24, 2018, 7:18 pm

Contiguous property

CS-v4 SSc6: Light Pollution Reduction
posted by Nadia Bini on Apr 17, 2018, 10:08 am

The LEEDv4 Reference Guide stipulates "when additional properties owned by the same entity responsible for the LEED project are contiguous to the project site and have the same or higher lighting...

Last reply: Dave Hubka, Apr 18, 2018, 1:19 pm

MR- Construction and Demolition waste Management: Group Approach

NC-v4 MRc5: Construction and demolition waste management
posted by MAUDE PINTAL on Mar 28, 2018, 10:54 am

RETIRED LEEDuser Expert 623 thumbs up March 29, 2018- 2:08 pm Maude- The Group and Campus Approaches outlined in the Reference Guide refer to multiple buildings being LEED certified at the same time. See page 10 of the BD+C Reference Guide (Projects Using Campus Certification) for more information. It does not include both LEED and non-LEED projects; however, I'm not an expert on Campus and Multiple Building certifications. I would suggest looking at these existing LEEDuser forums related to this topic-   https://leeduser.buildinggreen.com/forums?f[0]=im_taxonomy_forums:4813  - and seeing...

Last reply: RETIRED, Mar 29, 2018, 2:08 pm

Is a Sports Field Considered Graded or Prime Farmland?

NC-2009 SSc1: Site Selection
posted by Sophie Kerr on Mar 19, 2018, 9:43 am

Hello,

Our project was built on a former sports field. I was wondering if a sports  field (baseball) is considered graded or...

Last reply: Paula Melton, Mar 22, 2018, 2:38 pm

Bike Racks Joint To Facility

Schools-NC-v4 LTc6: Bicycle facilities
posted by Cora Kenrick on Mar 19, 2018, 1:25 pm

Hi Fellow LEED Users,

Looking for a bit of advice in regard to bike racks. I'm working on a new school construction, Is it possible to use the an overhang of a building as the shelter for...

Last reply: Cora Kenrick, Mar 19, 2018, 3:34 pm

New to LEED...Cheat sheet?

NC-v4 MPR1: Must be in a permanent location on existing land
posted by Cora Kenrick on Mar 13, 2018, 11:57 am

Hi Ladies & Gentlemen,

I'm new to LEED and VERY new to submission...I will be completing my first submission soon.

Its there any guide/cheat books that anyone can...

Last reply: Cora Kenrick, Mar 13, 2018, 2:31 pm

Clarification on the requirement "to be significantly better than standard sustainable design practices"

NC-2009 IDc1: Innovation in Design
posted by Ashley Hu on Mar 9, 2018, 2:55 pm

Hi everybody,

The documentation required of an innovation in design credit is a narrative that describes the credit intent, requirements, list of proposed submittals, design approach, and...

Social Housing

ND-Plan-v4 NPDc4: Housing types and affordability
posted by Stephani Carter on Mar 7, 2018, 6:38 pm

Hello, does anyone know if social housing can be counted as "affordable housing" for this credit? The units are not rented or for sale, but are for support communities / residents from a wide...

Last reply: Stephani Carter, Mar 8, 2018, 2:25 pm