Forum » Middle East
Topic

Estimating the energy cost share of PV

NC-2009 EAc2: On-Site Renewable Energy
posted by Mohamed M. Abd Elhameed on Jun 6, 2017, 4:46 am

I am working on an industrial LEED project in KSA. Most of electrical loads are for the industrial processes itself (i.e production line), while the other remaining loads are for HVAC and...

DCV In Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by VEL MUTHU on Jun 2, 2017, 8:21 am

Hi all,
Modelling DCV has been discussed many times in this forum. I gone through and understand quite a bit. I am listing my understanding along with some quires. Any response is much...

Last reply: Marcus Sheffer, Jun 2, 2017, 9:08 am

No 2-year, 24 hour design storm data available

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Mario S. on May 10, 2017, 2:54 am

The 2 year, 24-hour design storm precipitation data is unavailable for the country. However, Historic rainfall data exists.
Using that data, we will calculate the maximum runoff rate and...

Last reply: Mario S., May 12, 2017, 2:39 am

Separate Changing and Shower Rooms

CS-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Tee Howard on Apr 30, 2017, 7:54 am

Marilyn Specht Vice President & Managing Principal, US Sustainability Introba LEEDuser Expert 51 thumbs up May 3, 2017- 12:37 pm Hi Trina, Who told you to do that? My understanding is they do not require the changing room to be separate from the shower area. This is also discussed in the LEED CI-2009 SSc3.2 forum where it is confirmed you do not need separate rooms for the two. Log in or register to post comments ...

Last reply: Marilyn Specht, May 3, 2017, 12:37 pm

Sea Water Cooled Chiller Modeling

NC-v4 EAp2: Minimum Energy Performance
posted by Sefa Sahin on Apr 26, 2017, 7:53 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5796 thumbs up April 26, 2017- 9:45 am I think this would be possible with some type of water cooled condenser. Without going into the program and trying to figure it out I can't give you a step-by-step set of instructions. For LEED if it can't be modeled directly a work around would be required. If it is required make sure to follow G2.5 and provide a thorough narrative describing the work around. You might also consider posting your question on the eQUEST users forum at onebuilding.org. Someone there would be more likely...

Last reply: Marcus Sheffer, Apr 26, 2017, 9:45 am

Baseline System 2

NC-2009 EAc1: Optimize Energy Performance
posted by SSN Energy Model on Apr 16, 2017, 2:02 am

As per Table 6.8.1D, I observed the following
EER = 12.3-(0.213*Cap/1000) EER
Also, Cap means the rated cooling capacity of the product in...

Last reply: Marcus Sheffer, Apr 21, 2017, 10:48 am

Baseline EER- System 2 PTHP

NC-2009 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Apr 13, 2017, 6:32 am

As per Table 6.8.1D, I observed the following

EER = 12.3-(0.213*Cap/1000) EER

Also, Cap means the rated cooling capacity of the product in...

Last reply: Marcus Sheffer, Apr 21, 2017, 10:41 am

Natural Ventilation Loads Modeling

NC-2009 EAp2: Minimum Energy Performance
posted by Sefa Sahin on Mar 8, 2017, 9:17 am

Dear All,

We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively. Residential units are not include any fan for...

Last reply: Marcus Sheffer, Apr 21, 2017, 10:15 am

aerosol paints

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Abdulla Anwar on Mar 1, 2017, 9:00 am

is there any requirements for aerosol paints? which might be used by construction team for marking junction boxes purposes (inside weatherproof).

the question is there any criteria...

Last reply: Debra a. Lombard, Apr 19, 2017, 12:35 pm

System 2- LEED Fan Power ASHRAE 90.1.2007

NC-2009 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Apr 13, 2017, 2:07 am

Hi,

Greetings!

I am doing Energy Model for Labor Accommodation. I have some doubts and need your help,

Baseline system will be system 2 as per ASHRAE 90.1.2007. Since, the...

Last reply: Marcus Sheffer, Apr 13, 2017, 12:10 pm