Log in
Forum
Loading...
Topic

INNOVATION- PILOT CREDIT- Cooling tower water management

NC-v4 INc1: Innovation
posted by Maria Peralta on Jul 18, 2019, 11:05 am

Hello,

Im wondering about this possible pilot credit.

I am confused about the achievment of it, If my sistem doesn't have a cooling tower, it's means, that I can get the point and I...

Last reply: Deborah Lucking, Jul 18, 2019, 11:42 am

Grid resilience technologies

CS-v4.1 EAc4: Grid Harmonization
posted by Dionisio Franca on Jul 18, 2019, 3:17 am

Does anyone know the definition of islanding and part-load operation in:

  • Grid resilience technologies: project served by utilities with resilience programs in place, which leverage...

Confirmation of maximum point scoring and points table

CI-v4.1 EAc4: Renewable energy
posted by Han Qiang Ler on Jul 17, 2019, 10:02 pm

There appears to have a discrepancy in the guide dated 04_09_2019 version. The credit scorecard shows 6 points as maximum point, but the specific section mentioned that this is a prerequisite and...

LTc7- Reduce parking footprint- examplary performance

NC-v4 LTc7: Reduced parking footprint
posted by Maria Peralta on Jul 3, 2019, 10:27 am

Hello!  

I got a question regarding the credit LTc7.The project wich I am working with, doesnt have a parking, so, at is says in the leed guide "Projects with no associated off-street...

Last reply: Bipin Karki, Jul 18, 2019, 8:18 am

Chemical Source in Garage

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Ricardo Sá on Jul 18, 2019, 5:34 am

Dear All,

I have a question regarding LEED v2009 NC IEQ C5 - Indoor Chemical and Pollutant Source Control.

One of our projects has housekeeping room...

Single Family Homes, MR Credit: Environmentally Preferred Products- Local Production

LEED v4.1 Discussion Forum
posted by Walter Broner on Jul 17, 2019, 4:19 pm

Apologies if this has been answered already.

Option 1 has a 50% threshold for each building component that could meet the criteria.

Is the calculation supposed to be done by cost,...

10% peak demand reduction

NC-v4 EAc4: Demand response
posted by Yu Zhang on Jul 16, 2019, 10:00 pm

I have a project where...

Last reply: Marcus Sheffer, Jul 17, 2019, 4:04 pm

Prerequisites Submitted under Campus

LEED Rating System Selection
posted by Guillermo Hernandez Espinoza on Jul 2, 2019, 3:56 pm

Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus...

Last reply: Bipin Karki, Jul 17, 2019, 3:53 pm

NC-v4.1 Rainfall Events Calculator

NC-v4.1 SSc4: Rainwater management
posted by Kathryn Ganas on Jul 17, 2019, 12:20 pm

Is there an updated Rainfall Events Calculator for v4.1?? We have a...

Interior cross contamination prevention out of scope-CI

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Casey Cullen-Woods on Jul 16, 2019, 1:45 pm

I am working on a commercial interior fit out project that would like to pursue this credit. The...

Last reply: Casey Cullen-Woods, Jul 17, 2019, 2:19 pm