Artificial Turf

EBOM-v4.1 SSc1: Rainwater management
posted by Marisa Lydon on Feb 16, 2022, 10:32 pm

Is artificial turf considered hardscape? How does it compare to flat grass in terms of runoff coefficients?

LEED v4.1 EB O&M: How can data center projects overcome the constraints of the Arc energy score?

EBOM-v4.1 EAp3: Energy Performance
posted by JL on Mar 14, 2022, 5:25 pm

For LEED v4.1 EB O&M projects, I understand that Energy Performance scores are assigned in the Arc platform by considering a building's floor area, occupancy, and operating hours. And that...

Road surface sealcoating

EBOM-v4.1 MRp2: Facility maintenance and renovations policy
posted by michael owen on May 25, 2022, 8:32 am

What restrictions and or credits are available for asphalt sealcoating parking lots and roadway on a  LEED...

LEED OM V4.1 Location problem

EBOM-v4.1 LTp1: Transportation Performance
posted by Saba Hajizadeh on Jun 21, 2022, 6:14 am

Hello everyone,

I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do?

...

Water management

EBOM-v4.1 SSc1: Rainwater management
posted by Saba Hajizadeh on Jun 22, 2022, 7:06 am

I have read the V4.1. But still, I'm confused.

In a summary how are we gonna apply this credit to the project?

I know that I have to find rainfall data for at least 10 years. And...

Required Response Rate

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Hannah Walter on Jun 24, 2022, 10:43 am

The graph in Figure 1 seems to indicate that the absolute minimum response rate is 25%. When I use the equation,  100*(0.25/ square root (x/500), with x being occupancy, at an occupancy of 232...

Site Management Plan Evidence

EBOM-v4.1 SSc4: Site management
posted by Amgad Khattab on Aug 10, 2022, 2:57 am

Hi

I'm confusing about site management evidence because the required documention not mentioned any evidence to be provided. ONLY Site Management Plan!!

Should i upload any evidence...

Alternative transportation program

EBOM-v4.1 LTp1: Transportation Performance
posted by Mariel Ambiental on Sep 10, 2022, 2:17 pm

Hello everyone,

The project has an alternative transportation program, specifically a private shuttle service covering several routes with stops to and from the building location. More...

Parking & Retail Potential for LEED O&M

EBOM-v4.1 SSc4: Site management
posted by LEED Team on Sep 16, 2022, 9:21 am

We are looking to certify a mixed use parking and retail...

Commingled Waste approach in storage locations for recyclable materials

EBOM-v4.1 MRp3: Waste Performance
posted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am

I'm working on a huge existing Mall, Is the...