Log in
Forum
Loading...
Topic

VOC Limit for opaque paints for wood.

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Suhas Kurikkal on May 1, 2019, 9:26 am

We have opaque flat paint to be applied for the decorative...

Last reply: Michelle Rosenberger, May 2, 2019, 12:10 pm

Calculator table

NC-v4 SSc4: Rainwater management
posted by Gracielli Monteiro on May 2, 2019, 10:02 am

we used combined...

MRc5 Option 2

NC-2009 MRc5: Regional Materials
posted by Richard Metts on May 1, 2019, 4:45 pm

Hello to All!

I'm trying to figure the following and see if I am understanding Option 2 of MRc5

Say I have an extraction point that is 500 miles from manufacturing and they ship by...

Last reply: Suhas Kurikkal, May 2, 2019, 1:59 am

Non-certified buildings in LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jan 10, 2018, 7:01 am

Hi everyone,

The project area has two main buildings that just one of them will apply for LEED v 2009 - NC certification. They are totally separate buildings in terms of air-conditioning...

Last reply: Tristan Roberts, May 1, 2019, 11:49 pm

Vegetation Types

NC-v4.1 SSc3: Open space
posted by Chandan Jain on May 1, 2019, 2:44 pm

Per V4.1 BD+C beta guide "25% of the minimum 30% total outdoor space requirement must be planted with two or more types of vegetation". However, the guide does not specify the vegetation types,...

Water-Budget Analysis

NC-v4 IPc1: Integrative process
posted by Summer Minchew on Jul 25, 2017, 10:20 am

USGBC references the Indoor and Outdoor Water Reduction Calculators; any recommendations about additional tools a team should utilize in completing their water-budget analysis? EPA Water Budget...

Last reply: John Krutko, May 1, 2019, 3:09 pm

Vegetation Types

NC-v4.1 SSc3: Open space
posted by Tim Nabholz on May 1, 2019, 2:46 pm

Per V4.1 BD+C beta guide "25% of the minimum 30% total outdoor space requirement must be planted with two or more types of vegetation". However, the guide does not specify the vegetation types,...

Shadow Boxes: Counts as Fenestration or Opaque Surface?

NC-v4 EAp2: Minimum Energy Performance
posted by Waleed AlGhamdi on Apr 25, 2019, 4:45 pm

Spandrel panels are considered as opaque surfaces per the ASHRAE 90.1 definition. Kalwall and similar products count as fenestration since they allow in light. What about a "shadow box" in a...

Last reply: Marcus Sheffer, May 1, 2019, 1:47 pm

Process Crop or Landscaping?

NC-v4 WEc1: Outdoor water use reduction
posted by Candice Rogers on Apr 30, 2019, 12:51 pm

David Hubka Director- Program Development, Rivion LEEDuser Expert 204 thumbs up April 30, 2019- 1:56 pm Per the reference guide "food gardens may be excluded". I'd expect that you would be able to exclude your crops from credit requirements.  Good Luck! Log in or register to post comments Candice Rogers Paladin, Inc LEEDuser Premium Member 19 thumbs up May 1, 2019- 9:55 am I like that response very much.  Thank you for your quick thoughts!  This forum is a great tool when you just need to have a little external validation. Log in or register to post comments ...

Last reply: Candice Rogers, May 1, 2019, 9:55 am

STC Requirements in ANSI S12.60-2010

Schools-NC-v4 EQp3: Minimum acoustic performance
posted by Julie Hendricks on Apr 30, 2019, 5:52 pm

Can you confirm whether we have to meet the...