Log in
Forum
Topic

Five year shade calculation.

NC-2009 SSc7.1: Heat island effect - nonroof
posted by sara frye on Apr 27, 2011, 4:34 pm

Apologies in advance as I know I have read the answer to my question somewhere. I just can't find it. WHEN should the five year shade calculation be performed? i.e time of day, time of year?...

Last reply: Jacob Arlein, May 9, 2011, 8:16 pm

WE p1 CI and CS

CI-2009 WEc1: Water Use Reduction
posted by Garrison Elder on Apr 27, 2011, 3:53 pm

I am a little confused by what i have read concerning WEp1 and what fixtures are being used by a tenant vs what is in the scope.
I have a CS poject where I will acheive 32% water savings....

Last reply: Tristan Roberts, Nov 22, 2011, 12:34 am

Scope of comissioning

EBOM-2009 EAc2.3: Existing building commissioning - ongoing commissioning
posted by Iris Amdur on Apr 27, 2011, 3:25 pm

Hello-

We're working on a building that is not owner occupied and the tenant has 48 additional pieces of equipment that are not a part of the...

Last reply: Jacob Arlein, Mar 2, 2012, 3:51 pm

"Other Non-structural Elements" covered elsewhere??

CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Gail von Staden on Apr 27, 2011, 2:06 pm

The project we are working on is looking to take advantage of MRc1.2 Building Reuse. However, this credit seems to only cover the basic non-structural elements - walls, floors, ceiling etc....

Last reply: Tristan Roberts, May 19, 2011, 11:58 pm

IEQp1 compliance for high-rise with 1 outdoor air intake

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Dawn Brenner on Apr 27, 2011, 2:06 pm

The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007. The building has only one...

Last reply: David Hubka, Dec 2, 2011, 10:08 am

FTE Calculations

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Hugh Hagues on Apr 27, 2011, 1:45 pm

My project building has a number of leased spaces that will not be included in our final LEED application, however each of these spaces has full time employees who use the public restrooms and...

Last reply: Jenny Carney, May 12, 2011, 9:22 pm

Pre K and K school question

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Sara Sweeney on Apr 27, 2011, 11:38 am

I had perviously contacted...

Last reply: Sara Sweeney, May 26, 2011, 11:22 am

Gross ARI rated cooling capacity

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Devani PERERA on Apr 27, 2011, 7:12 am

Hi,
Where should I get the "gross ARI rated cooling capacity" for air to water heat pumps ? This is not covered by ARI 550/590 which usually applies to chillers. On the technical data...

Last reply: Christopher Schaffner, Nov 28, 2011, 1:09 pm

Process for corrective action

CS-2009 EAc5.2: Measurement and verification - tenant submetering
posted by Maya Karkour on Apr 27, 2011, 3:50 am

Hello,

One of the requirements of EA Credit 5.2 is to "provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved"....

Last reply: Gordon Shymko, Nov 28, 2011, 1:24 pm

LEED CS two building complex

LEED Guidance for Campuses and Multiple Buildings
posted by Diego Prada on Apr 26, 2011, 1:09 pm

Hi,

We are working on certifying a two builiding project with LEED CS. These buildings share a common project boundary and parking areas. They are part of the same project and were...

Last reply: Tristan Roberts, Apr 26, 2011, 9:42 pm