Log in
Forum
Topic

Job Opening! Manager of High Performance and Sustainable Construction

Help Wanted: LEED-related Jobs
posted by Susan Heinking on May 2, 2023, 1:42 pm

Looking to make a difference on the Construction side of the industry? Come join Pepper Construction!  We are a midwest based...

Process consumptions

Warehouses-EBOM-v4.1 EAp3: Energy Performance
posted by RICCARDO BALLESIO on May 3, 2023, 11:13 am

We are analysing the electrical energy consumption of our client. The building is a warehouse of approximately 10.000 sqm with 1000 sqm of offices. The building is provided with a photovoltaic...

Ventilation

Warehouses-EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by RICCARDO BALLESIO on May 3, 2023, 11:19 am

All office spaces are naturally ventilated. The minimum opening location and size requirements are satisfied for all offices, restroom and meeting rooms.

In case we find some areas such as...

Senior cohousing

LEED Rating System Selection
posted by Gianfranco Ibarcena on Jun 2, 2023, 1:04 pm

I am developing a senior cohousing project. It has 34 permanent homes in a maximum of 3 stories buildings. It also has common areas like restaurant, gym or laundy room only for internal use and ...

Parking Generation 4th edition

Help Wanted: LEED-related Jobs
posted by Rasha Ameer on Jun 2, 2023, 2:17 pm

Hello everyone,

Can someone please check if the 4th edition parking generation has General Office Building? I found it in the list but not in the figures. Can anyone help solve my problem...

Residential High-Rise: BD+C New Construction vs. LEED Homes

LEED Rating System Selection
posted by Vitor Leite Goncalves on Jun 30, 2023, 12:56 pm

Hello all,

The project is a 6-story residential building located in the United States. USGBC website says that...

Completed fit out by owner for rentable office building- not known future tenants

LEED Rating System Selection
posted by ANGELIKI ANTONIOU on Jul 4, 2023, 9:29 am

Hello everyone!

We have a 3 storey office buidling which is designed to be rented per floor.

The tenants have not yet been determined. The architectural layout is fix (location and...

How do you evaluate time period of work towards submitting credit-related documentation for application?

Performance Period
posted by Marine Petrosyan on Jul 17, 2023, 11:23 am

Hi!

Would appreciate it, if you could help with the following question. 

How do you count the time, required for preparation of documentation for each credit / prereq? Will you...

SITES Calculators

SITES Discussion Forum
posted by Dalia Abdalla on Jul 27, 2023, 3:13 am

Hello,

I noticed that the SITES calculator are only available upon project registration. Is there any other way around to get these calculators as there are requirements that we would like...

Any check list of preprequisites and credits that require photos?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Marine Petrosyan on Jul 31, 2023, 4:46 am

Hi, LEED user community!

Help me please identify and list or find the appropriate list of credits that require photographing the related site/equipment/etc (v.4, BD+C, Core and Shell)....