Log in
Forum
Topic

zone floor area

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Traci Stotts on Mar 24, 2011, 4:36 pm

Is the 'zone floor area' in the prescriptive calcs bascially just the area on the floor plan that is determined by the width of the window x twice the height? Can I not include any area that is...

Last reply: Jean Marais, Aug 12, 2011, 11:35 am

IEQc8.2_Views for Exemplary Performance- Documentation

CI-2009 IEQc8.2: Daylight and views - views
posted by Gail von Staden on Apr 8, 2011, 10:10 am

Dear Leeduser Forum :-)

I'm working on a commercial interiors project that I hope can acheive the EP points. But, I'm still not sure about some of the criteria descriptions and how to...

Last reply: Lauren Fakhoury, Aug 12, 2011, 9:08 am

Multiple Innovation Points for Green Cleaning

NC-2009 IDc1: Innovation in Design
posted by Jennifer Wehling on May 11, 2011, 1:01 pm

Our Team is working on a project under NC 2009. In the past we have been awarded an innovation point for a green housekeeping program. But I am wondering, using Path 1 to borrow credits from...

Last reply: Erica Downs, Aug 11, 2011, 4:40 pm

Eco-Healthy Child Care Initiative

NC-2009 IDc1: Innovation in Design
posted by Linda Davisson on Feb 17, 2011, 9:43 am

In case anyone is designing a child care facility, our team for the FDA Child Care Center recently achieved an ID credit for committing to the Eco-Healthy Child Care Initiative. If anyone is...

Last reply: Elizabeth Powers, Aug 11, 2011, 4:20 pm

Entrance lobby as live-work space

Pilot-Credits PC14: Walkable Streets
posted by Jens Apel on Aug 10, 2011, 7:30 am

In my project there is a main entrance lobby that includes a permanently manned reception. Would that count as live-work space for category "Ground-Level Use and Parking" option h?
I am not...

Last reply: Chris Marshall, Aug 11, 2011, 2:29 pm

SS 1 Option 2 Path 9

CI-2009 SSc1: Site Selection
posted by Augusto Velazquez on Jul 8, 2011, 7:07 pm

I am having trouble filling out the LEED Online template for option 9. The site in which our project is located has an onsite tertiary treatment plant that treats all of the wastewater generated...

Last reply: Susann Geithner, Aug 11, 2011, 1:53 pm

Green Roof Installation Timing

NC-2009 SSc7.2: Heat island effect - roof
posted by Jeremy Knoll on Aug 10, 2011, 4:07 pm

I am working on a green roof in St. Louis, MO which is due to be complete by October. We are having difficulty getting plant cuttings from local nursuries, as the planting window is so short for...

Last reply: Susann Geithner, Aug 11, 2011, 1:44 pm

The data I have to work with

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Kash Boodjeh on Jul 19, 2011, 3:47 pm

The data I have to work with for filling this credit out are pre- and post-development calculations for a 100 year storm with a duration of 1 hour. How does this relate/convert to 1-yr, 24 hr and...

Last reply: Susann Geithner, Aug 11, 2011, 1:20 pm

LEED Project Boundary, Existing Irrigation, and Crane Placement

NC-2009 WEc1: Water Efficient Landscaping
posted by Brooks Critchfield on Aug 1, 2011, 8:30 am

We have a project on an existing campus which requires that two large cranes sit next to the project on an adjacent turf area. We do not plan to do any improvements on this turf area and plan to...

Last reply: Susann Geithner, Aug 11, 2011, 1:14 pm

ASHRAE Table 6.8.1 Centrifugal Chillers

CS-2009 EAp2: Minimum Energy Performance
posted by Redy Truccolo on Jul 22, 2011, 4:58 am

Hi,

in the table 6.8.1J of ASHRAE 90.1 there is a "condenser Flow rate" parameter, expressed in gpm/ton.
My question is: to calculate this parameter do I have to use the nominal...

Last reply: David Eldridge, Aug 11, 2011, 1:06 pm