Log in
Forum
Topic

Accumulating Annexes

Living with LEED Online - quirks, bugs and hiccups
posted by Paola Figueiredo, Newton Figueiredo on Aug 26, 2011, 1:08 pm

The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for...

Secret Lease

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by David Edenburn on Jul 19, 2011, 11:25 pm

In MR c1.1 and in other credits LEED asks for a (redacted) copy of the lease for term, utility payments, etc. In our case we have been told that the entire lease is confidential and cannot be...

Last reply: Nadav Malin, Aug 26, 2011, 12:41 pm

About Option 3: Measurement

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Diego Prada on May 5, 2011, 4:02 pm

Hello,

If one decides to use option 3 to show compliance with this credit, should the light measurements have to be done in a specific time of the day? This doesn't seems to be the case,...

Last reply: TODD REED, Aug 26, 2011, 10:13 am

is a closed landfill automatically a brownfield?

NC-2009 SSc3: Brownfield Redevelopment
posted by Amanda Redmond-Neal on Aug 12, 2011, 1:42 pm

My project is to be built on top of a landfill that was closed in 1961. I have a very comprehensive "Final Closure and Post-Closure Maintenance Plan" that details required monitoring of the site...

Last reply: Larry Sims, Aug 26, 2011, 9:28 am

Region Where LT Leases are NOT Common

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by Raymond Loo on Jul 27, 2011, 11:12 pm

Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit? Do they consider the circumstances that a 5+5...

Last reply: Raymond Loo, Aug 26, 2011, 9:11 am

Non smoking facility

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Barbara Redmond on Mar 24, 2010, 10:24 am

Hi, My company became a "smoke free" workplace effective January 1, 2010. All the documentation I have read says that we need both a policy and a communication for this pre-req. However, when I...

Last reply: Elliot Powers, LEED AP BD+C, Aug 26, 2011, 4:50 am

Thermal blocks for multifamily residential building

NC-2009 EAp2: Minimum Energy Performance
posted by Emma Eliasson on Aug 12, 2011, 6:51 am

I have a question about thermal blocks in multy family residential buildings.

I'm working with a building that has 4 floors and totly 7 appartments. Floor 1-3 have 2 appartments and the...

Last reply: Nadav Malin, Aug 25, 2011, 11:35 pm

Projected Biomass Boiler

NC-2009 EAc2: On-Site Renewable Energy
posted by Jose Salinas on Aug 4, 2011, 10:22 am

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust. The fase out of the...

Last reply: Nadav Malin, Aug 25, 2011, 11:25 pm

PV Watts for other countries?

NC-2009 EAc2: On-Site Renewable Energy
posted by Nelina Loiselle on Aug 17, 2011, 5:19 pm

Help Please! Our...

Last reply: Nadav Malin, Aug 25, 2011, 11:23 pm

Ventilation Rate Schedule sample

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Nelina Loiselle on Aug 9, 2011, 2:14 pm

Nelina Loiselle Above Green LEEDuser Basic Member 239 thumbs up August 11, 2011- 10:56 am Is there only one Ev rate for the whole system. Log in or register to post comments Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 839 thumbs up August 25, 2011- 11:17 pm Thanks, Nena, We'll look into this and see if there something better. Anyone on the forum have a sample they'd like to offer? Log in or register to post comments ...

Last reply: Nadav Malin, Aug 25, 2011, 11:17 pm