Log in
Forum
Topic

Secret Lease

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by David Edenburn on Jul 19, 2011, 11:25 pm

In MR c1.1 and in other credits LEED asks for a (redacted) copy of the lease for term, utility payments, etc. In our case we have been told that the entire lease is confidential and cannot be...

Last reply: Nadav Malin, Aug 26, 2011, 12:41 pm

About Option 3: Measurement

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Diego Prada on May 5, 2011, 4:02 pm

Hello,

If one decides to use option 3 to show compliance with this credit, should the light measurements have to be done in a specific time of the day? This doesn't seems to be the case,...

Last reply: TODD REED, Aug 26, 2011, 10:13 am

is a closed landfill automatically a brownfield?

NC-2009 SSc3: Brownfield Redevelopment
posted by Amanda Redmond-Neal on Aug 12, 2011, 1:42 pm

My project is to be built on top of a landfill that was closed in 1961. I have a very comprehensive "Final Closure and Post-Closure Maintenance Plan" that details required monitoring of the site...

Last reply: Larry Sims, Aug 26, 2011, 9:28 am

Region Where LT Leases are NOT Common

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by Raymond Loo on Jul 27, 2011, 11:12 pm

Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit? Do they consider the circumstances that a 5+5...

Last reply: Raymond Loo, Aug 26, 2011, 9:11 am

Non smoking facility

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Barbara Redmond on Mar 24, 2010, 10:24 am

Hi, My company became a "smoke free" workplace effective January 1, 2010. All the documentation I have read says that we need both a policy and a communication for this pre-req. However, when I...

Last reply: Elliot Powers, LEED AP BD+C, Aug 26, 2011, 4:50 am

Thermal blocks for multifamily residential building

NC-2009 EAp2: Minimum Energy Performance
posted by Emma Eliasson on Aug 12, 2011, 6:51 am

I have a question about thermal blocks in multy family residential buildings.

I'm working with a building that has 4 floors and totly 7 appartments. Floor 1-3 have 2 appartments and the...

Last reply: Nadav Malin, Aug 25, 2011, 11:35 pm

Projected Biomass Boiler

NC-2009 EAc2: On-Site Renewable Energy
posted by Jose Salinas on Aug 4, 2011, 10:22 am

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust. The fase out of the...

Last reply: Nadav Malin, Aug 25, 2011, 11:25 pm

PV Watts for other countries?

NC-2009 EAc2: On-Site Renewable Energy
posted by Nelina Loiselle on Aug 17, 2011, 5:19 pm

Help Please! Our...

Last reply: Nadav Malin, Aug 25, 2011, 11:23 pm

Ventilation Rate Schedule sample

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Nelina Loiselle on Aug 9, 2011, 2:14 pm

Nelina Loiselle Above Green LEEDuser Basic Member 239 thumbs up August 11, 2011- 10:56 am Is there only one Ev rate for the whole system. Log in or register to post comments Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 836 thumbs up August 25, 2011- 11:17 pm Thanks, Nena, We'll look into this and see if there something better. Anyone on the forum have a sample they'd like to offer? Log in or register to post comments ...

Last reply: Nadav Malin, Aug 25, 2011, 11:17 pm

Reclaimed Mahogany on Homes Project

LEED for Homes (LEED-H) Forum
posted by anastasia harrison on Aug 11, 2011, 12:53 pm

Is it permissible to use a reclaimed mahogany door that is not...

Last reply: Peter Kennedy, Aug 25, 2011, 10:22 pm