Log in
Forum
Topic

Option 1

Pilot-Credits PC12: Reduced Automobile Dependence
posted by Jun Hashimoto on Jul 27, 2011, 9:20 pm

I completed option 1. My LEED-CI project is a confidential project, but is located in a dense urban area with well-developed public transportation. It seems too easy to earn the point in such a...

Last reply: Fred Dock, Aug 29, 2011, 12:25 pm

Do Handicap Spaces Count?

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Michael Pulaski on Aug 22, 2011, 8:12 pm

For a healthcare project that has a significant number of handicap parking spaces (nearly 1/3 of the parking capacity), can we exclude the handicap spaces when tallying up the total vehicle...

Last reply: Susan Walter, Aug 29, 2011, 11:26 am

Community Connectivity- residential density

CS-2009 SSc2: Development Density and Community Connectivity
posted by Mark Pappas on Aug 26, 2011, 10:51 am

I am working on a project (LEED CS 2.0) that easily meets the services requirement, but I'm having a hard time with the residential...

Last reply: Chris Marshall, Aug 29, 2011, 11:23 am

WEc2 Regional Priority Credit

EBOM-2009 RPc1: Regional Priority
posted by Kevin Wilcox on Aug 26, 2011, 5:37 pm

I have a EBOM...

Last reply: Susan Walter, Aug 29, 2011, 11:07 am

I was under the impression

General forums
posted by Bill Swanson on Aug 3, 2011, 8:48 am

Bill, for those of us reading this forum who get the car metaphor, but don't know anything about BUG ratings, is there any chance you could summarize your key suggestions here in easy-to-grasp terms?...

Last reply: Bill Swanson, Aug 29, 2011, 11:02 am

LEED Certification for Phase wise construction

General forums
posted by Ramesh Narayanan on Aug 29, 2011, 6:33 am

Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 834 thumbs up August 29, 2011- 10:06 am I've responded to this question in the MRc4 forum. Please continue the conversation there. Log in or register to post comments ...

Last reply: Nadav Malin, Aug 29, 2011, 10:06 am

Development footprint exceeding previously developed

General forums
posted by Ricardo Sobral on Aug 28, 2011, 8:11 am

LTprerequisite1- Case 1- What happens is the new development footprint exceeds the previously developed portions of the site?

% of annual rainfall treated?

NC-2009 SSc6.2: Stormwater design - quality control
posted by Kash Boodjeh on Aug 22, 2011, 3:06 pm

The reference guide states that "90% of the avg annual rainfall is equivalent to treating the runoff from 1" of rainfall for a...

Last reply: Gregory Hurst, Aug 26, 2011, 6:09 pm

Parking Lighting not through Building Elect Service

NC-2009 SSc8: Light Pollution Reduction
posted by Michelle Rosenberger on Aug 26, 2011, 4:56 pm

My project puts a new community center on an existing masterplanned campus. My LEED boundary includes new and relocated parking that serve the new building and are part of my project team's scope...

LEED CS 2009 LEED ENERGY MODEL

CS-2009 EAc1: Optimize Energy Performance
posted by John Harrington on Aug 24, 2011, 5:14 pm

My proposed system is a WSHP. However, the heat from electric exceeds the heat used from boiler in the WSHP loop.

I would condiser the primary heating source in this building to be...

Last reply: John Harrington, Aug 26, 2011, 4:45 pm