Log in
Forum
Topic

Foyer as occupided or unnocupied space

NC-2009 IEQc8.2: Daylight and views - views
posted by marisol cano on Aug 17, 2011, 6:24 pm

Hello,
Anybody knows if a Foyer in a Hotel (mainly a hall to access 3 meting rooms with a "coffe and cookies" table for the meeting room users) would count as occupied space?

...

Last reply: David Posada, Aug 17, 2011, 8:16 pm

Responsible Sourcing of Raw Materials

General forums
posted by Anne Less on Aug 17, 2011, 5:29 pm

Intent: "To protect ecosystems, respect cultural and community values, and improve land use through responsible sourcing of raw materials used for building products."

The requirement for...

Applying to LEED 2009 for NC

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by Emily Catacchio on Jul 27, 2011, 12:55 pm

I'm working on a project that would like to apply this credit to a new construction building. The new building is part of a college campus, but the LEED boundary only includes the new building....

Last reply: Jamie Brady, Aug 17, 2011, 5:22 pm

Options and Paths for Pilot Credit 16

Pilot-Credits SSpc16: Rainwater management
posted by Laura Millberg on Jan 12, 2011, 11:53 am

I'm confused by the Options and Paths for this credit. Does Option 2 achieve more credits than Option 1?

Last reply: Chris Fleming, Aug 17, 2011, 3:53 pm

Evidence Required

Pilot-Credits PC12: Reduced Automobile Dependence
posted by Méabh Browne on Jun 21, 2011, 5:42 am

We are working on LEED CI project and participating in this pilot credit, which we given the city centre location that we are in would be easily achieved. I wondered what evidecne would be...

Last reply: Michael Smithing, Aug 17, 2011, 1:27 pm

Energy and Water Data Release form- Option 3

Schools-2009 EAc5: Measurement and Verification
posted by Rachel Birnboim on Aug 15, 2011, 5:21 pm

If we pursue this option, are we only eligable for one point for this credit? That's what is coming up on my template, even though it says that i'm pursuing two credits.

Last reply: Marcus Sheffer, Aug 17, 2011, 12:26 pm

Gross Lighted Area- ASHRAE 90.1-2007

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Trevor Karstens on Jul 7, 2011, 4:57 pm

This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways:

I'm encountering difficulty in documenting the minimum...

Last reply: Susann Geithner, Aug 17, 2011, 10:57 am

Existing Fixtures Calculated in Installed Lighting Power?

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by David Rodriguez on Aug 16, 2011, 6:45 pm

I have a renovation project where there are three rooms in which we are not replacing the light fixtures. ASHRAE 90.1 Section 9.1.1 states, "..lighting requirements for existing building are...

Last reply: Susann Geithner, Aug 17, 2011, 10:49 am

Option 2, Outside US

Pilot-Credits PC12: Reduced Automobile Dependence
posted by Anna Korinkova on Aug 16, 2011, 8:22 am

Hi all,
We are working on a project situated in the Czech Republic, Prague.
Is it possible to go for Option 2 and use Prague Planning Office as a metropolitan planning organization?...

Last reply: Fred Dock, Aug 16, 2011, 4:31 pm

Hard copy signatures

General forums
posted by Mike Barker on Aug 16, 2011, 4:26 am

My observations, from an international point of view, are as follows :-

1) A hard copy, in the form of a comitment by the engineer on a company letterhead with his full signature, will...