Log in
Forum
Topic

Region Where LT Leases are NOT Common

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by Raymond Loo on Jul 27, 2011, 11:12 pm

Has anyone in a region where long term contracts are not common, had experience (of if you have any comments) dealing with USGBC on this credit? Do they consider the circumstances that a 5+5...

Last reply: Raymond Loo, Aug 26, 2011, 9:11 am

Non smoking facility

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Barbara Redmond on Mar 24, 2010, 10:24 am

Hi, My company became a "smoke free" workplace effective January 1, 2010. All the documentation I have read says that we need both a policy and a communication for this pre-req. However, when I...

Last reply: Elliot Powers, LEED AP BD+C, Aug 26, 2011, 4:50 am

Thermal blocks for multifamily residential building

NC-2009 EAp2: Minimum Energy Performance
posted by Emma Eliasson on Aug 12, 2011, 6:51 am

I have a question about thermal blocks in multy family residential buildings.

I'm working with a building that has 4 floors and totly 7 appartments. Floor 1-3 have 2 appartments and the...

Last reply: Nadav Malin, Aug 25, 2011, 11:35 pm

Projected Biomass Boiler

NC-2009 EAc2: On-Site Renewable Energy
posted by Jose Salinas on Aug 4, 2011, 10:22 am

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust. The fase out of the...

Last reply: Nadav Malin, Aug 25, 2011, 11:25 pm

PV Watts for other countries?

NC-2009 EAc2: On-Site Renewable Energy
posted by Nelina Loiselle on Aug 17, 2011, 5:19 pm

Help Please! Our...

Last reply: Nadav Malin, Aug 25, 2011, 11:23 pm

Ventilation Rate Schedule sample

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Nelina Loiselle on Aug 9, 2011, 2:14 pm

Nelina Loiselle Above Green LEEDuser Basic Member 239 thumbs up August 11, 2011- 10:56 am Is there only one Ev rate for the whole system. Log in or register to post comments Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 836 thumbs up August 25, 2011- 11:17 pm Thanks, Nena, We'll look into this and see if there something better. Anyone on the forum have a sample they'd like to offer? Log in or register to post comments ...

Last reply: Nadav Malin, Aug 25, 2011, 11:17 pm

Reclaimed Mahogany on Homes Project

LEED for Homes (LEED-H) Forum
posted by anastasia harrison on Aug 11, 2011, 12:53 pm

Is it permissible to use a reclaimed mahogany door that is not...

Last reply: Peter Kennedy, Aug 25, 2011, 10:22 pm

Equivalent to Green-E

CI-2009 EAc4: Green Power
posted by Wayne L. Appleyard on Jun 27, 2011, 11:47 am

Has anyone defined this? We are looking at purchasing RECs directly from one or more schools or other non-profits that have not sold RECS. We have an independent who has experience with...

Last reply: Susann Geithner, Aug 25, 2011, 6:00 pm

General LEED-CI question

CI-2009 MRc4: Recycled Content
posted by Kimberly Cullinane on Aug 25, 2011, 10:11 am

I am working with a client that is looking at multiple new spaces in multiple locations. Some of the new spaces will be leased spaces, but we do not know yet to what extent they will need to...

Last reply: Susann Geithner, Aug 25, 2011, 5:51 pm

Parking Management Authority: No Allowance for Carpooling Spaces

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Juan Monterrosa on Aug 22, 2011, 8:10 pm

I am trying to gather documentation for a college campus in Prince George that has leased out it's car parks to Impark, an agency that manages the lots and charges people for parking.

...

Last reply: Chris Marshall, Aug 25, 2011, 3:14 pm