Log in
Forum
Topic

Lighting Controllability in Restaurant Dining & Bar Areas

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Karla Fisk on Jul 26, 2011, 9:57 am

Has anyone ever had a restaurant NC project where you were able to come up with a method of controlling lighting in the dining/bar area?
Were you able to achive this credit?

Last reply: Lauren Sparandara, Sep 9, 2011, 12:51 pm

Low Emitting Interiors- Move HC only criteria to all BD&C

General forums
posted by Tom Lent on Sep 7, 2011, 8:32 pm

There are requirements in this credit that originated in LEED for Healthcare due to the extra concern about health in its development. They are, however, robust credits that could and arguably...

Last reply: Dwayne Fuhlhage, Sep 9, 2011, 12:16 pm

Industrial buildings: EAc1 Optimize Energy Performance

CS-2009 EAc1: Optimize Energy Performance
posted by Jane Long on Apr 5, 2011, 9:36 am

Hi,

I’m working on a pre-assessment for a large manufacturing (aircraft) plant.

While a number of ‘reduction’ strategies are being considered, they do not represent a significant...

Last reply: Jane Long, Sep 9, 2011, 11:42 am

lavatory faucets with different flow rate

CI-2009 WEp1: Water Use Reduction
posted by Grace Ming on Aug 22, 2011, 6:52 am

Hello All,
In our project, we have 2 types of lavatory faucets (different quantity) with two different flow rates. One type constitutes 20% and the other type 80% of total faucets. How...

Last reply: Susann Geithner, Sep 9, 2011, 10:43 am

In the past, the published

General forums
posted by David Posada on Jun 1, 2010, 3:46 pm

In the past, the published schedule for Design Phase preliminary review has been a minimum of 25 business days (about 5 weeks) and a minimum of 15 business days (3 weeks) for the Final Review....

Last reply: Susann Geithner, Sep 9, 2011, 10:16 am

Most Appropriate Specialty

General forums
posted by Scott Dunning on Sep 8, 2011, 6:17 pm

I'd like to have a clear understanding of which specialty will be considered 'most' appropriate for any given project. Can a LEED AP+BD&C 'count' for a project pursuing LEED CI certification...

v2.0 timeline

General forums
posted by Daniela Castro Salgado on Sep 8, 2011, 6:11 pm

I am pretty sure you have 25 business days under v3, but is it 30 business days for v2.0 then? I can't find that information anywhere.

Cost of Renewable Energy

NC-2009 EAc1: Optimize Energy Performance
posted by Gregg Achtenhagen on May 26, 2011, 11:57 am

I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.

I know I can double-dip on EAc1 and EAc2, so do I need to include...

Last reply: Christopher Schaffner, Sep 8, 2011, 1:25 pm

Baseline Virtual Energy Rate

NC-2009 EAc1: Optimize Energy Performance
posted by Nick Morgan on Jul 15, 2011, 12:14 pm

I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1.

The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:11 am

Modeling OA for naturally ventilated space

NC-2009 EAc1: Optimize Energy Performance
posted by Orlin Velinov, PE on Jul 20, 2011, 1:20 am

We have a project that is a parking garage...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:04 am