Log in
Forum
Topic

FSC-certified products definition and case studies

NC-2009 MRc7: Certified Wood
posted by Cassini Kit on Sep 1, 2011, 7:58 am

Does...

Last reply: Judy Landwehr, Sep 1, 2011, 11:01 am

Pre-rinse spray valves

CS-2009 WEp1: Water Use Reduction
posted by Tapio Peltonen on Aug 4, 2011, 3:51 am

LEED-CS 2009 form WEp1 version 4.0 states the following:
"Note: The flow rate for all pre-rinse spray valves must be less than or equal to 1.6 gpm. If there are multiple fixtures with...

Last reply: Susann Geithner, Sep 1, 2011, 9:42 am

Dewatering

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Daniel Bulley on Mar 9, 2010, 2:36 pm

Would dewatering at a site (from excavation to a storm drain)have an impact on this prerequisite or stormwater credit?

Last reply: Emily Catacchio, Aug 31, 2011, 5:40 pm

Shading of Hardscapes

EBOM-2009 SSc7.1: Heat island effect - nonroof
posted by JOHN COOK on Aug 30, 2011, 7:19 pm

We want to show that we are shading our hardscape but performing the necessary modeling of vegetation shadows at 10am, 12noon and 3pm on the summer solstice is proving difficult. However we do...

Last reply: David Posada, Aug 31, 2011, 2:02 pm

Addenda revisions--- building vs tenant space

CI-2009 WEc1: Water Use Reduction
posted by Lida Lewis on Aug 20, 2010, 2:51 pm

in the Reference Guides and addenda, however, there are some small things like this to look out for. That's one thing this forum is good for. Log in or register to post comments Stacey Olson SW Regional Design...

Last reply: Stacey Olson, Aug 31, 2011, 1:43 pm

Recycled Steel content

NC-2009 MRc4: Recycled Content
posted by Katie Ellsworth on Jul 27, 2011, 2:32 pm

We have several steel items that have been purchased for our contractors project. Most of the items show a total...

Last reply: Keith Lindemulder, Aug 31, 2011, 12:42 pm

Ooptimize Energy Performance

CS-2009 EAc1: Optimize Energy Performance
posted by Paula Hernandez on Aug 31, 2011, 11:03 am

I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me,
Thans

Last reply: Susann Geithner, Aug 31, 2011, 11:46 am

LEED Retail CI customer and FTE calculations

CI-2009 WEc1: Water Use Reduction
posted by Jeanne Varney on Aug 12, 2011, 12:54 pm

For LEED Retail CI, to calculate the WEc1 water reduction you have to input the number of...

Last reply: Susann Geithner, Aug 31, 2011, 11:40 am

Multi-family residential- ASHRAE 62.1 2007- ch. 5 Natural Vent

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Michele Helou on Aug 18, 2011, 11:22 am

We have a mixed use retail - residential project with the residential units relying on natural ventilation with the required 4% operable window area to floor area ratio.
The problem is that...

Last reply: Michael Wironen, Aug 31, 2011, 9:55 am

LEED definition of weatherproofing system

General forums
posted by Tristan Roberts on May 11, 2010, 10:54 am

of Representatives LEEDuser Expert 11470 thumbs up August 31, 2011- 8:42 am Petr, there has been a lot of discussion, some of it more definitive, on this question in some of the IEQc4 forums on this site. Check...

Last reply: Tristan Roberts, Aug 31, 2011, 8:42 am