lavatory faucets with different flow rate

CI-2009 WEp1: Water Use Reduction
posted by Grace Ming on Aug 22, 2011, 6:52 am

Hello All,
In our project, we have 2 types of lavatory faucets (different quantity) with two different flow rates. One type constitutes 20% and the other type 80% of total faucets. How...

Last reply: Susann Geithner, Sep 9, 2011, 10:43 am

In the past, the published

General forums
posted by David Posada on Jun 1, 2010, 3:46 pm

In the past, the published schedule for Design Phase preliminary review has been a minimum of 25 business days (about 5 weeks) and a minimum of 15 business days (3 weeks) for the Final Review....

Last reply: Susann Geithner, Sep 9, 2011, 10:16 am

Most Appropriate Specialty

General forums
posted by Scott Dunning on Sep 8, 2011, 6:17 pm

I'd like to have a clear understanding of which specialty will be considered 'most' appropriate for any given project. Can a LEED AP+BD&C 'count' for a project pursuing LEED CI certification...

v2.0 timeline

General forums
posted by Daniela Castro Salgado on Sep 8, 2011, 6:11 pm

I am pretty sure you have 25 business days under v3, but is it 30 business days for v2.0 then? I can't find that information anywhere.

Cost of Renewable Energy

NC-2009 EAc1: Optimize Energy Performance
posted by Gregg Achtenhagen on May 26, 2011, 11:57 am

I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.

I know I can double-dip on EAc1 and EAc2, so do I need to include...

Last reply: Christopher Schaffner, Sep 8, 2011, 1:25 pm

Baseline Virtual Energy Rate

NC-2009 EAc1: Optimize Energy Performance
posted by Nick Morgan on Jul 15, 2011, 12:14 pm

I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1.

The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:11 am

Modeling OA for naturally ventilated space

NC-2009 EAc1: Optimize Energy Performance
posted by Orlin Velinov, PE on Jul 20, 2011, 1:20 am

We have a project that is a parking garage...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:04 am

EAC1- Day Lighting & Other Lighitng controls input

NC-2009 EAc1: Optimize Energy Performance
posted by susan eguia on Jul 28, 2011, 1:44 pm

Hi,

We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits. So, we're just coordinating whatever electrical information we need to complete...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:03 am

Comparing Process Pumping between Baseline and Proposed

NC-2009 EAc1: Optimize Energy Performance
posted by Evelyn Dicks, EI, CxA on Jul 31, 2011, 11:44 am

I am working on a lab building near the coast where seawater is pumped into the building for use by researchers. The system gets complex, but essentially we are controlling these large "raw"...

Last reply: Christopher Schaffner, Sep 8, 2011, 11:00 am

Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)

NC-2009 EAc1: Optimize Energy Performance
posted by Evelyn Dicks, EI, CxA on Jul 31, 2011, 1:14 pm

I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant....

Last reply: Christopher Schaffner, Sep 8, 2011, 10:54 am