Topic | Recent |
---|---|
LEED Credit Qualification for waste plastics in asphaltLEED Rating System Selectionposted by Chris Sparks on Dec 10, 2019, 3:40 pm
Hi Everyone, My company is based out of San Diego and is working with asphalt manufacturers to use waste plastics as a partial oil replacement in asphalt. We divert plastics that... |
|
Material Ingredient Reporting: Most efficient program to use for Site FurnishingsLEED v4.1 Discussion Forumposted by Ryan Demchuk on Jan 9, 2020, 3:39 pm
Hello, we are a site furnishings manufacturer with the intention of ensuring our products can qualify for usage under multiple LEED credits. We are hoping to receive any guidance... |
|
how to cancel an incomplete registration?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Floriana Calise on Jan 10, 2020, 6:47 am
Hello, How do I cancel an incomplete registration? I've created it in order to explain a client how to register a project and now it appears with its ID number when I open... |
|
Rating system for a renovation existing building for Senior HousingLEED Rating System Selectionposted by Juan Perugia on Jan 14, 2020, 5:29 am
Hello, I would like to know which rating system should I choose to certify a minor renovation for a building that is for Senior Residence. Is it "hospitality" rating system? best... |
|
Domestic Hot Water System TypeMid-Rise-v4 EAc1: Annual energy useposted by Daniel Lim on Jan 15, 2020, 10:45 am
I am modeling the annual energy use for a mid-rise residential building. The hot water for the showers and lavatory faucets will be provided by tankless electric instantaneous heater installed in... |
|
Certification for a Mfg FacilityLEED Rating System Selectionposted by Rick Alfandre on Jan 15, 2020, 4:09 pm
We are working on a new manufacturing facility that fabricates Pre-Cast Concrete planks. There is a very small office space, and a small portion of storage, but it is primarly fabrication. ... |
|
green builders in New EnglandLEED v4.1 Discussion Forumposted by DiegoMaxwell DiegoMaxwell on Jan 16, 2020, 2:41 am
Hey, I just found this sub, so apologies if this post isn't appropriate. I've been working as a carpenter for a few years and am getting interested in building science. I'd like to work... |
|
Waste Management- CommingledLEED v4.1 Discussion Forumposted by Alexis Stewart on Jan 21, 2020, 10:22 am
I read the below for LEED V4: How the language currently reads, if you recycle 10 different materials all in 1 commingled dumpster, that only counts as 1 waste stream. This makes material... |
|
Lead Based Paint WasteLEED v4.1 Discussion Forumposted by Alexis Stewart on Jan 21, 2020, 10:59 am
In the beginning of the project we had a large portion of Lead based paint that was disposed of. How does this count? Is there a way to not include this in our waste counts? |
|
Owner´s representative: requirements? can be changed?Navigating LEED Onlineposted by Victoria Rios Esteve on Jan 23, 2020, 3:21 pm
Hi everyone! My team and I are wondering if there are any requirements when selecting the owner´s representative within LEED Online. Will this person have access to LEED Online? And... |