Log in
Forum
Topic

LEED AP with Specialty

General forums
posted by Sara Neff on Sep 12, 2011, 1:59 pm

I am in favor of requiring that LEED APs have a specialty in order to get an additional point in a certification. I coordinate LEED projects for a living, and far, far too often I have to work...

IEQ 8.1: VLTxWFR- why the upper limit of.180?

CI-2009 IEQc8.1: Daylight and views - daylight
posted by Andy Plogsted on Sep 1, 2011, 3:46 pm

i am entering data, and have a small room with wide windows that push the number to .26. Based on what I have investigated, I need to adjust the daylight zone (in this case up) to get it within...

Last reply: TODD REED, Sep 12, 2011, 1:29 pm

MR Prerequisite Construction and Demo Debris

General forums
posted by Jon Texter on Aug 2, 2011, 4:44 pm

"Establishes contractual requirements with responsible waste and recycling haulers, including waste reporting requirements for involved parties."

We have found that the recycling programs...

Last reply: Beth Cheuvront, Sep 12, 2011, 1:19 pm

Shading devices vs daylighting

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Rudolph Schaar on Aug 29, 2011, 9:11 am

ASHRAE 189.1, 8.4.1.2 requires us to have permanent shading devices. We are attempting to achieve the Daylighting credit 8.1. For the prescriptive method, does an interior or exterior shading...

Last reply: TODD REED, Sep 12, 2011, 1:19 pm

Unlabeled fenestration visible light transmission(VLT)

NC-2009 IEQc8.1: Daylight and views - daylight
posted by gwenedd murray on Sep 5, 2011, 11:04 am

I have several projects where the fenestration VLT...

Last reply: TODD REED, Sep 12, 2011, 1:04 pm

PF Prerequisite: Water Metering

General forums
posted by RETIRED on Sep 12, 2011, 12:34 pm

I already submitted my comments on this prerequisite to USGBC but just noticed the following that needs to be addressed. The revised language for reporting mentions only the submeters – not the “...

refrigerant charge formula for r123

EBOM-2009 EAc5: Enhanced Refrigerant Management
posted by Pablo Fortunato Suarez on Jan 24, 2011, 5:25 am

Our supplier who does the recharging of refrigerants has a standard formula for determining the refrigerant charge based on minutes per day of purge pump out operation. The values end up being...

Last reply: Ben Stanley, Sep 12, 2011, 11:32 am

shift work

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Martin Mechtenberg on Nov 21, 2009, 11:05 am

This question is really in regards to NC 2.2, but I assume the same would apply here: Do projects with shift work need to provide bike racks for the...

Last reply: Mark Meaders, Sep 12, 2011, 11:09 am

IEQc4.4 Addendum Question

General forums
posted by Lauren Fakhoury on Sep 12, 2011, 10:10 am

I asked...

Documentation- No Extraction Location Data

CI-2009 MRc5: Regional Materials
posted by Kellie Hollenbeck on Aug 31, 2011, 5:46 pm

I may have missed this but, what does the project team input in the template if there is no extraction data provided from the manufacturer but they have the manufacturing distance and wish to...

Last reply: Kellie Hollenbeck, Sep 12, 2011, 8:53 am