Cost of Renewable EnergyNC-2009 EAc1: Optimize Energy Performanceposted by Gregg Achtenhagen on May 26, 2011, 11:57 am
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2. I know I can double-dip on EAc1 and EAc2, so do I need to include... Last reply: Christopher Schaffner, Sep 8, 2011, 1:25 pm |
|
Baseline Virtual Energy RateNC-2009 EAc1: Optimize Energy Performanceposted by Nick Morgan on Jul 15, 2011, 12:14 pm
I am in the process of submitting the LEED templates (2009 NC) for EAp2/EAc1. The building in question has been modeled using Energy Pro and has calculated a baseline virtual energy rate... Last reply: Christopher Schaffner, Sep 8, 2011, 11:11 am |
|
Modeling OA for naturally ventilated spaceNC-2009 EAc1: Optimize Energy Performanceposted by Orlin Velinov, PE on Jul 20, 2011, 1:20 am
We have a project that is a parking garage... Last reply: Christopher Schaffner, Sep 8, 2011, 11:04 am |
|
EAC1- Day Lighting & Other Lighitng controls inputNC-2009 EAc1: Optimize Energy Performanceposted by susan eguia on Jul 28, 2011, 1:44 pm
Hi, We've only done the mechanical portion for this project but the client assigned to us the EAc1 credits. So, we're just coordinating whatever electrical information we need to complete... Last reply: Christopher Schaffner, Sep 8, 2011, 11:03 am |
|
Comparing Process Pumping between Baseline and ProposedNC-2009 EAc1: Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on Jul 31, 2011, 11:44 am
I am working on a lab building near the coast where seawater is pumped into the building for use by researchers. The system gets complex, but essentially we are controlling these large "raw"... Last reply: Christopher Schaffner, Sep 8, 2011, 11:00 am |
|
Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)NC-2009 EAc1: Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on Jul 31, 2011, 1:14 pm
I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant.... Last reply: Christopher Schaffner, Sep 8, 2011, 10:54 am |
|
Energy Modeling: Dome (Design) vs. Dome (Baseline)?NC-2009 EAc1: Optimize Energy Performanceposted by Nelina Loiselle on Aug 8, 2011, 5:14 pm
I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome. This building type was selected because it is resilient to hurricane... Last reply: Christopher Schaffner, Sep 8, 2011, 10:49 am |
|
Baseline HVAC Equip Vs. Proposed HVAC EquipNC-2009 EAc1: Optimize Energy Performanceposted by Greengrade User on Aug 17, 2011, 10:07 am
Question: Last reply: Christopher Schaffner, Sep 8, 2011, 10:42 am |
|
SLL Credit 3 Reduced Auto DependenceGeneral forumsposted by Peter Doo on Feb 26, 2011, 9:52 pm
Requirements emphasize "existing" transit service. I assume that new transit service is negotiated as part of the project plan will also count. Please confirm. Last reply: Daniel Costantino, Sep 8, 2011, 8:57 am |
|
USGBC responses?General forumsposted by Bill Swanson on Sep 8, 2011, 8:00 am
I saw Chrissy Macken make several comments on August 10th, but I haven't seen anything from USGBC since then. It's been a month, and the comment window is almost closed. Will anyone from USGBC... |