Exterior Lighting Power Allowances

NC-2009 EAp2: Minimum Energy Performance
posted by Omer Moltay on Jun 15, 2011, 9:41 am

We are struggling with some definitions from Table 9.4.5 of 90.1-2007. If our building has exterior landscaping, is that covered by any of the area types under Tradable Surfaces (for example...

Last reply: Marcus Sheffer, Sep 19, 2011, 12:12 pm

Manufacturing Plant Addition- Option 3

NC-2009 EAp2: Minimum Energy Performance
posted by Aaron Wascher on Jun 6, 2011, 4:44 pm

I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum. The owner...

Last reply: Marcus Sheffer, Sep 19, 2011, 12:10 pm

Building occupied intermittently and use of Motion Sensors

NC-2009 EAp2: Minimum Energy Performance
posted by Brooks Critchfield on May 31, 2011, 5:19 pm

We have a 3,000 SF building which will be occupied intermittently by the client/owner.

One small part of the building is being continuously maintained at occupied temperatures, a second...

Last reply: Marcus Sheffer, Sep 19, 2011, 12:08 pm

Construction Details in Baseline Model

NC-2009 EAp2: Minimum Energy Performance
posted by Xing Shi on May 31, 2011, 11:51 am

In ASHRAE90.1-2007, the construction type and U value of Baseline Model is regulated. We use EnergyPlus to do energy modeling, so there is a problem, where can we find standard construction...

Last reply: Marcus Sheffer, Sep 19, 2011, 12:06 pm

case 2. Residential and Hospital Projects Only- Requirements

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Veronika Sundberg on Jun 14, 2011, 5:29 am

Hi, I have a question regarding case 2. Residential and Hospital Projects Only.

In the requirement for the prerequiset 8 bullets are listed that needs to be met. The four first ones are...

Last reply: Veronika Sundberg, Sep 19, 2011, 5:12 am

Warehouse Classification

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Prudence Ferreira on Jul 21, 2011, 3:55 pm

We are trying to classify a winery. One of the areas is used for barrel fermentation, and is temperature controlled anywhere from 55-75 degrees based on the fermentation process. Would this...

Last reply: Jenny Carney, Sep 16, 2011, 3:33 pm

Energy Bills are the Entire Site and Not Broken Down by Building

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Cynthia Fowler on Aug 9, 2011, 2:39 pm

My project building is one of 40+ on a company's campus/site. They do not purchase electricity on a building-by-building basis, but for the entire site. My project building is metered and the...

Last reply: Jenny Carney, Sep 16, 2011, 3:30 pm

Added $$ for Pre-Reqs in PF Category

General forums
posted by Julie Hendricks on Sep 11, 2011, 9:04 pm

Overall, the prerequisites in this category are going to add significant cost to a base LEED certification over LEED 2009. I'd like to hear from...

Last reply: Scott Bowman, Sep 16, 2011, 9:23 am

countertops CSI classification

NC-2009 MRc4: Recycled Content
posted by Annette Bellafiore on Mar 9, 2010, 4:55 pm

The guidelines for MRc3 - 7 indicate that only items in Division 3 - 10, 31 and 32 should be included in the calculations unless you want to include all furniture. However, it seems like...

Last reply: Benjie Herrera, Sep 16, 2011, 7:50 am

MR Credit- Environmentally Preferable Structure and Enclosure

General forums
posted by Keith Lindemulder on Sep 13, 2011, 5:13 pm

First - PLEASE bring back some kind of number system like MR4, MR5, whatever...these credit names are too difficult to remember and differentiate.

Case in point, under Option 2 of the...

Last reply: Keith Lindemulder, Sep 15, 2011, 3:35 pm