Topic | Recent |
---|---|
Multi-Family Buildings with Non-Residential EntrancesND-v2009 NPDc9: Access to civic and public spaceposted by Sara Zoumbaris on Apr 19, 2016, 11:23 am
Hi, we have a site with several multi-use buildings which have non-residential entrances and a main entrance which will lead to residential lobby etc. Within the form in table NPDc9-1, when it... Last reply: Eliot Allen, Apr 19, 2016, 4:27 pm |
|
Fire Station FTENC-2009 PIf3: Occupant and Usage Dataposted by Deborah Morgan on Jan 16, 2015, 10:07 am
I have a fire station that will have 9 fire fighters working 24-hour shifts. Last reply: Summer Minchew, Apr 18, 2016, 4:54 pm |
|
Same Landscaped Area but Different Plantings?CS-2009 WEc1: Water Efficient Landscapingposted by Brian Salazar on Mar 22, 2016, 7:35 pm
I should know this, but.... Is it OK to run the WEc1 calcs with the same landscaped area (in square feet), but with different plantings in the baseline and design cases? In other words if... Last reply: Andrey Kuznetsov, Apr 18, 2016, 3:16 pm |
|
Alternative Compliance for M&VNC-2009 EAc5: Measurement and Verificationposted by Deborah Lucking on Mar 31, 2016, 7:51 pm
All, Last reply: Deborah Lucking, Apr 18, 2016, 12:55 pm |
|
Separate Storage EnclosureNC-2009 PIf2: Project Summary Detailsposted by David Hryvniak on Apr 15, 2016, 9:01 am
I am working on a project that has a small, separate generator... Last reply: Jon Clifford, Apr 17, 2016, 10:48 am |
|
LEED user Assembly Calculator for Certified WoodNC-2009 MRc7: Certified Woodposted by Esther Kohout on Apr 15, 2016, 3:45 pm
Still confused on... |
|
Alternative calculation for MRc2NC-2009 MRc2: Construction Waste Managementposted by Marcia Weekes on Jan 4, 2016, 7:52 am
It has come to my attention that in my local market, most if not all waste management companies use visual inspections to determine recycling rates for commingled loads. I am aware that this is... Last reply: Marcia Weekes, Apr 15, 2016, 5:56 am |
|
conductive rubber flooringNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Lyle Axelarris on Apr 30, 2015, 2:43 pm
In the past, we've used FloorScore-certified Static Dissipative rubber Tiling for Comm rooms. The client is now asking for conductive rubber flooring instead of dissipative. The proposed... Last reply: Lyle Axelarris, Apr 14, 2016, 9:31 pm |
|
recessed walk off matEBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source controlposted by Bomin Kim on Apr 11, 2016, 2:26 pm
We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted. Do you know if the walk of mat needs to be... Last reply: Trista Brown, Apr 14, 2016, 7:29 pm |
|
MPR3- Hotel in Mixed Use BuildingCI-2009 MPR3: Must use a reasonable site boundaryposted by Sara Zoumbaris on Apr 14, 2016, 10:24 am
Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants. On the ground floor is a restaurant parallel to our Hotel Lobby ,... |