Topic | Recent |
---|---|
wow! also heard ASHRAE isGeneral forumsposted by Jean Marais on Jun 1, 2011, 10:02 am
wow! also heard ASHRAE is translating standards into Spanish...are we slowly becoming global? |
|
Which systemNC-2009 EAp2: Minimum Energy Performanceposted by David Anderson on Jun 1, 2011, 9:37 am
I have a project I am trying to model. the overall building is just over 25,000sf. The is an office area that is about 11,000sf and enclosed parking area, and an enclosed utility space. The... Last reply: thomas beal, Jul 6, 2011, 5:22 pm |
|
VOC unit conversionNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by James Chueh on Jun 1, 2011, 5:39 am
Hi, I've come across some products that are labelled with a... Last reply: Carrie Webster, Jun 14, 2011, 9:18 am |
|
Understanding how hazardous materials effect calculationsNC-2009 MRc2: Construction Waste Managementposted by Renee Shirey on May 31, 2011, 5:28 pm
Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition. If it is not selectively/carefully demo'd, the ACM... Last reply: RETIRED, Mar 11, 2013, 6:43 pm |
|
Building occupied intermittently and use of Motion SensorsNC-2009 EAp2: Minimum Energy Performanceposted by Brooks Critchfield on May 31, 2011, 5:19 pm
We have a 3,000 SF building which will be occupied intermittently by the client/owner. One small part of the building is being continuously maintained at occupied temperatures, a second... Last reply: Marcus Sheffer, Sep 19, 2011, 12:08 pm |
|
Dual Flush ConvertersEBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Prudence Ferreira on May 31, 2011, 5:08 pm
Would the USGBC accept a dual flush converter as compliant vs installing new toilets? Last reply: Jason Franken, Sep 13, 2011, 10:19 am |
|
Green Power-contract / purchase dateCS-2009 EAc6: Green Powerposted by C. Anthony Menefee on May 31, 2011, 2:04 pm
Is it possible for the owner to sign the 2 year contract and begin energy consumption before the building is completed and occupied? Last reply: Marcus Sheffer, Feb 2, 2018, 6:07 pm |
|
Controllability of Systems- Lighting DocumentationCI-2009 IEQc6.1: Controllability of systems - lightingposted by Robert Longo, AIA, LEED AP on May 31, 2011, 1:42 pm
How do I go about providing documentation to meet this credit. I am working on a fit out project for a new office. There are roughly 900 cubes with task lighting at each cube, offices with... Last reply: Lauren Sparandara, May 31, 2011, 7:11 pm |
|
Too much daylight?!?!Schools-2009 IEQc8.1: Daylight and views - daylightposted by Tyler Barter on May 31, 2011, 1:41 pm
Hello, I am in the process of working on collecting information for LEED certification on 3 different schools that all have large amounts of glass in the cafeteria, gym, and Library, as well as a... Last reply: Eddy Santosa, Jun 20, 2011, 1:37 pm |
|
Construction Details in Baseline ModelNC-2009 EAp2: Minimum Energy Performanceposted by Xing Shi on May 31, 2011, 11:51 am
In ASHRAE90.1-2007, the construction type and U value of Baseline Model is regulated. We use EnergyPlus to do energy modeling, so there is a problem, where can we find standard construction... Last reply: Marcus Sheffer, Sep 19, 2011, 12:06 pm |