Log in
Forum
Topic

Private lavatory faucet

CI-2009 WEp1: Water Use Reduction
posted by Sundararaj Subburaman on Jun 17, 2011, 2:29 am

Hi,

We have a project that consists of an office space, a laboratory, and a salon area for testing health care products. Kindly advice if the water fixtures in the salon area has to be...

Last reply: Sundararaj Subburaman, Sep 23, 2011, 1:05 am

Required Signatory- Contractor

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by jacque decker on Sep 22, 2011, 5:56 pm

Hi,
I noticed that the new 3.0 version templates for IEQ...

Last reply: Nadav T. Malin, Sep 22, 2011, 7:49 pm

check with GBCI

General forums
posted by Tristan Roberts on Sep 22, 2011, 3:24 pm

Brian, I am not familiar with how to deal with this issue. From what I know about LEED Online, you may have to send new invites or even start over at an earlier point. I would check with...

Last reply: Brian Wolfe, Sep 22, 2011, 6:12 pm

calculating solar / mechanical square footage

NC-2009 SSc7.2: Heat island effect - roof
posted by Gita Nandan on Jan 5, 2011, 12:38 pm

in calculating the 50% area of a roof to be installed with a green roof for this credit, one can deduct the mechanical area and area covered by solar systems. in our project, our solar array is...

Last reply: Michelle Teague, Sep 22, 2011, 6:11 pm

LEED and Ergonomics

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Linda Miller on Sep 22, 2011, 4:47 pm

Seeking your Input:

Does your organization have a policy pertaining to Leadership in Energy and Environmental Design (LEED)? This study may be for you, we are examining how ergonomics is...

Garage and technical rooms

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by BH . on Aug 30, 2011, 10:01 am

Hello,

We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them? Do...

Last reply: Dylan Connelly, Sep 22, 2011, 3:01 pm

Option 1: Full Flush-out Before Occupancy- Is there a Min. CF?

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Michelle Bracewell-Musson on Aug 4, 2011, 10:50 am

With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min...

Last reply: Dylan Connelly, Sep 22, 2011, 11:37 am

Public LEED Project Directory

General forums
posted by Amber Sausen on Sep 21, 2011, 6:38 pm

Did you look at the certified project directory provided by USGBC? http://www.usgbc.org/LEED/Project/CertifiedProjectList....

Last reply: Sheela I, Sep 22, 2011, 11:34 am

Outdoor Air Delivery Monitoring System installed post-occupancy

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Philip Herriges on Aug 23, 2010, 6:22 pm

Our building owner is having a building-wide outdoor air delivery monitoring system installed throughout the building (not just in the LEED-tenant area of our project) but it won't be installed...

Last reply: Dylan Connelly, Sep 22, 2011, 11:24 am

Non-Densely Occupied Spaces Served by Existing AHU

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Michelle Ruda on Sep 20, 2011, 2:33 pm

If you have non-densely occupied spaces served by an existing...

Last reply: Dylan Connelly, Sep 22, 2011, 11:20 am