Floor area calculating

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mohamed Ravuthar, LEED AP, BD+C on Sep 25, 2011, 9:52 am

I'm using the Option 2 - Prescriptive Approach for this credit, In particular room has 6 windows and each side two and one side no windows. Now i have calculated the window area and floor area...

Last reply: TODD REED, Sep 26, 2011, 10:14 am

Regularly occupied spaces for stadiums

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Adriana Hansen on Sep 22, 2011, 5:53 pm

We are in doubt about the classification of regularly occupied spaces for a stadium.
It will have the administrative area that will obviously be regularly occupied, but what about the VIP...

Last reply: TODD REED, Sep 26, 2011, 10:11 am

Existing Finish

CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Sara Neff on Apr 28, 2011, 3:29 pm

I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has...

Last reply: Raymond Loo, Sep 25, 2011, 6:05 am

O&M Manual is the bible

General forums
posted by Bazeeth Ahamed Khader Mohamed Ali on Sep 23, 2011, 3:00 pm

I have taken the exam in Feb 2011 and passed with 187. There are no short cuts. Get familize with the reference manual. Practice questions from GBES or Ever Blue may help you more

Last reply: Bazeeth Ahamed Khader Mohamed Ali, Sep 24, 2011, 5:52 am

Appeal Fees Up

Understanding the Cost of LEED-NC Project Certification
posted by Devon Bertram on Sep 23, 2011, 3:57 pm

Just a note that appeal fees are up to $800 for some EA and EQ credits (primarily EAp1, EAp2, EAc1, EQp1 and EBOM EAc2). See updates for more details:
...

Thank You for Your Comments!

General forums
posted by Theresa Backhus on Sep 23, 2011, 2:59 pm

I would like to thank everyone for their 2012 SS comments! We are taking all of these LEEDuser comments into consideration, and will use them to help guide the next phase of this process.

LEED for Schools, or LEED NC?

General forums
posted by Maya Karkour on Jun 30, 2011, 3:26 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11470 thumbs up September 23, 2011- 1:13 pm George, please post this question under our rating system selection forum. You can find the link to that forum on this page: http://www.leeduser.com/node/add/forum Log in or register to post comments ...

Last reply: Tristan Roberts, Sep 23, 2011, 1:13 pm

Meeting humidity requirements with mixed mode

NC-2009 IEQc7.1: Thermal comfort - design
posted by Carly Ruggieri on Aug 16, 2011, 10:42 am

Does anyone have any experience or guidance for documenting compliance with ASHRAE 55 with a mechanically conditioned, naturally ventilated building? When windows are open, the required humidity...

Last reply: Patrik Lazzari, Sep 23, 2011, 11:49 am

Help needed: Process Energy / Water- 25% Default vs. Actual

NC-2009 EAc1: Optimize Energy Performance
posted by Dan Prows on Feb 10, 2010, 4:09 pm

We have a child care center in the SE US. We did very well on envelope, lighting, and mechanical design (53% reduction in those areas). The building has a commercial kitchen with several...

Last reply: Marcus Sheffer, Sep 23, 2011, 9:23 am

Private lavatory faucet

CI-2009 WEp1: Water Use Reduction
posted by Sundararaj Subburaman on Jun 17, 2011, 2:29 am

Hi,

We have a project that consists of an office space, a laboratory, and a salon area for testing health care products. Kindly advice if the water fixtures in the salon area has to be...

Last reply: Sundararaj Subburaman, Sep 23, 2011, 1:05 am