Log in
Forum
Topic

NEBB Certification Required?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Nathan Lee on Sep 8, 2011, 8:48 pm

A question about NEBB Certification. Is the...

Last reply: Tristan Roberts, Sep 26, 2011, 9:58 pm

Required Number of Construction Inspections?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Benjamin Tressler on Sep 19, 2011, 11:19 am

Does LEED specify a required number of...

Last reply: Tristan Roberts, Sep 26, 2011, 9:52 pm

see Reference Guide

LEED Recertification: When and How
posted by Tristan Roberts on Aug 3, 2010, 11:07 am

Paul, most of your questions are answered in the introductory portion of the LEED-...

Last reply: Barry Giles, Sep 26, 2011, 6:54 pm

Control types in Group Multi-occupant Spaces

EBOM-2009 IEQc2.2: Controllability of systems - lighting
posted by Jenny Carney on Mar 7, 2011, 5:48 pm

All,

Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces. Historically, pretty much any kind of control was...

Last reply: Andrea Marzullo, Sep 26, 2011, 3:52 pm

LZ2 10 foot “hot spots”

NC-2009 SSc8: Light Pollution Reduction
posted by Vincent Pieri on Sep 26, 2011, 3:36 pm

We are owrking on a project on previously developed land that we have established as complying with IESNA LZ2. The surface parking for the project runs along the Southern edge of our site, which...

LEED 2012 Credit Comments

General forums
posted by Jeff Chapman on Sep 14, 2011, 7:21 pm

SS Credit: Site Development— Open Space : I like the changes to this credit, it makes it easier to understand and implement to achieve the credits intent.

SS Credit: Rainwater Management...

Last reply: Glenn Heinmiller, Sep 26, 2011, 3:33 pm

Floor area calculating

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mohamed Ravuthar, LEED AP, BD+C on Sep 25, 2011, 9:52 am

I'm using the Option 2 - Prescriptive Approach for this credit, In particular room has 6 windows and each side two and one side no windows. Now i have calculated the window area and floor area...

Last reply: TODD REED, Sep 26, 2011, 10:14 am

Regularly occupied spaces for stadiums

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Adriana Hansen on Sep 22, 2011, 5:53 pm

We are in doubt about the classification of regularly occupied spaces for a stadium.
It will have the administrative area that will obviously be regularly occupied, but what about the VIP...

Last reply: TODD REED, Sep 26, 2011, 10:11 am

Existing Finish

CI-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Sara Neff on Apr 28, 2011, 3:29 pm

I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has...

Last reply: Raymond Loo, Sep 25, 2011, 6:05 am

O&M Manual is the bible

General forums
posted by Bazeeth Ahamed Khader Mohamed Ali on Sep 23, 2011, 3:00 pm

I have taken the exam in Feb 2011 and passed with 187. There are no short cuts. Get familize with the reference manual. Practice questions from GBES or Ever Blue may help you more

Last reply: Bazeeth Ahamed Khader Mohamed Ali, Sep 24, 2011, 5:52 am