Log in
Forum
Topic

Expected volume of recycling

CI-2009 MRp1: Storage and Collection of Recyclables
posted by Nina Tallering on Jun 16, 2011, 6:53 pm

How do I calculate the 'expected volume of recycling'?

I realize this is a redundant post/question, however, we continue to receive...

Last reply: Michelle Rosenberger, Sep 27, 2011, 1:23 pm

Ventiltions Rates Healthcare Facilities

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Veronika Sundberg on Jun 13, 2011, 3:28 am

Hi,

I am working on a hospital project with a vast amount of different space types. Table 6.1 found in the ASHRAE standard lists very few of the “Occupancy Categories” that we have in our...

Last reply: Roger Chang, Sep 27, 2011, 11:11 am

landfill has a recycle/reuses program in place

NC-2009 MRc2: Construction Waste Management
posted by ming zeng on Sep 26, 2011, 5:21 pm

We have a project that the local landfill has a recycle/...

Last reply: Tristan Roberts, Sep 27, 2011, 10:47 am

Modeling a unique HVAC System

NC-2009 EAp2: Minimum Energy Performance
posted by matthew strong on Sep 8, 2011, 6:07 pm

matthew strong LEEDuser Basic Member 33 thumbs up September 22, 2011- 6:04 pm I see that the comment that I've posted here has gotten no responses. We would just like to know if anyone has modeled a system like this and, if so, do you think we have to model this as a district energy system since we are using the return side of the loop? Any feedback would be appreciated. Thanks. Log in or register to post comments Gerard Hazel Owner Sustainable Systems LLC LEEDuser Basic Member 14 thumbs up September 27, 2011- 8:13 am Matthew, You might want to try posting this in the energy modeling forums...

Last reply: Gerard Hazel, Sep 27, 2011, 8:13 am

Pavement and Trees

NC-2009 MRc2: Construction Waste Management
posted by Michelle Teague on Sep 8, 2011, 9:46 pm

The definition of construction and demolition debris on page 362 of the technical guide says "pre-existing structures". I understand the exclusion of land clearing debris, such as soil,...

Last reply: Tristan Roberts, Sep 26, 2011, 10:32 pm

NEBB Certification Required?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Nathan Lee on Sep 8, 2011, 8:48 pm

A question about NEBB Certification. Is the...

Last reply: Tristan Roberts, Sep 26, 2011, 9:58 pm

Required Number of Construction Inspections?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Benjamin Tressler on Sep 19, 2011, 11:19 am

Does LEED specify a required number of...

Last reply: Tristan Roberts, Sep 26, 2011, 9:52 pm

see Reference Guide

LEED Recertification: When and How
posted by Tristan Roberts on Aug 3, 2010, 11:07 am

Paul, most of your questions are answered in the introductory portion of the LEED-...

Last reply: Barry Giles, Sep 26, 2011, 6:54 pm

Control types in Group Multi-occupant Spaces

EBOM-2009 IEQc2.2: Controllability of systems - lighting
posted by Jenny Carney on Mar 7, 2011, 5:48 pm

All,

Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces. Historically, pretty much any kind of control was...

Last reply: Andrea Marzullo, Sep 26, 2011, 3:52 pm

LZ2 10 foot “hot spots”

NC-2009 SSc8: Light Pollution Reduction
posted by Vincent Pieri on Sep 26, 2011, 3:36 pm

We are owrking on a project on previously developed land that we have established as complying with IESNA LZ2. The surface parking for the project runs along the Southern edge of our site, which...