Log in
Forum
Topic

Exemplary Performance- forms question

NC-2009 MRc2: Construction Waste Management
posted by André Knutsson on Sep 19, 2011, 8:09 am

We have finished the project whith a 97.2 % recycling, and are pursuing the one Innovation in Design credit. When we register the IDc1.1 we do not get to choose the MRc2 in the dropdown window...

Last reply: André Knutsson, Sep 28, 2011, 2:40 am

AREA CRITERIA

CS-2009 EAp2: Minimum Energy Performance
posted by RICARDO GUEMEZ DIAZ on Aug 9, 2011, 6:54 pm

HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS. THE CONDITIONED AREA IS 130,000 FT2 WITH 9 LEVELS OF OFFICE...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:15 pm

Building Slabs: not in Developer's scope of work

CS-2009 EAp2: Minimum Energy Performance
posted by LEED Pro Consultant on Jul 5, 2011, 2:09 pm

In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope). It is a 10-story building with 2 glass façades with high-...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:12 pm

Energy Modeling

CS-2009 EAp2: Minimum Energy Performance
posted by Yolanda Sanchez on Jul 11, 2011, 1:39 pm

In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope). It is a 10-story building with 2 glass façades with high-...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:10 pm

Compliance with Appendix G ASHRAE

CS-2009 EAp2: Minimum Energy Performance
posted by Daniela Castro Salgado on Aug 10, 2011, 7:04 pm

We have a 14 storie-152600sft building which we are interested in certifying, however, there are 2 problems:

1. The client does not want a water treatment plant.
2. The client wants...

Last reply: Marcus Sheffer, Sep 27, 2011, 10:02 pm

LEED CS- EAp2 Existing equipment to remain

CS-2009 EAp2: Minimum Energy Performance
posted by BAOQUY VU on Aug 23, 2011, 9:24 am

I have an existing 90,000 SF, 3-story office building in Massachusetts consisting of...

Last reply: Marcus Sheffer, Sep 27, 2011, 9:58 pm

Tenant build-out

CS-2009 EAp2: Minimum Energy Performance
posted by Marco ZM on Aug 29, 2011, 6:34 am

We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent....

Last reply: Marcus Sheffer, Sep 27, 2011, 9:49 pm

Estimating credit acheivement

CS-2009 SSc6.2: Stormwater design - quality control
posted by Amanda Ross on Sep 27, 2011, 7:35 pm

1) Does anyone know of any local/regional programs with the 80% standard in the Vancouver, BC area? Our project is located in Surrey, BC.

My civil engineer tells me that he knows of no...

Creme Marfil Marble

CI-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Colleen Ice on Sep 27, 2011, 12:42 pm

I see a lot of threads based on hard surface materials being exempt, but what about marble. I need to find the life cycle data for other credits, but do I need FloorScore information on this...

Last reply: Colleen Ice, Sep 27, 2011, 2:13 pm

Expected volume of recycling

CI-2009 MRp1: Storage and Collection of Recyclables
posted by Nina Tallering on Jun 16, 2011, 6:53 pm

How do I calculate the 'expected volume of recycling'?

I realize this is a redundant post/question, however, we continue to receive...

Last reply: Michelle Rosenberger, Sep 27, 2011, 1:23 pm