Log in
Forum
Topic

acrylic textured coating

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Dario Ibarguengoitia on Aug 12, 2011, 1:33 pm

How would I clasify an acrylic textured coating?
Thank you very much!!!!

Last reply: Dario Ibarguengoitia, Oct 3, 2011, 2:50 pm

Credit Calculations

Pilot-Credits PC19: Whole Building Reuse
posted by Christine Robbins-Elrod on Oct 3, 2011, 12:28 pm

Hi, I'd like to verify if I have documented this Pilot Credit correctly?
-I have included exterior windows in the building envelope calculations since the team is preserving all existing...

EAC1 Credit Information

NC-2009 EAc1: Optimize Energy Performance
posted by Sari Kujawa on Sep 21, 2011, 1:27 pm

Under the credit information website with "Credits, Credit Details, Points, Thresholds" listed. The Path is noted as "12% new/8% existing (1 pt) while our template form notes 10 points documented...

Last reply: Sari Kujawa, Oct 3, 2011, 8:42 am

ASHRAE 90.1 APPENDIX G Existing Building Model including shading

CS-2009 EAp2: Minimum Energy Performance
posted by Fabiano Castro on Sep 26, 2011, 4:56 pm

We are modelling a Major Renovation Project under the ASHRAE 90.1-2007 - APPENDIX G. The building existing conditions prior to this project renovation includes solar shading devices on all...

Last reply: Marcus Sheffer, Oct 1, 2011, 12:32 pm

Floor area calculating

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mohamed Ravuthar, LEED AP, BD+C on Sep 27, 2011, 7:06 am

my question is how to calculate the sq ft area of the particular room to find out the window to floor ratio ?How to assume that the window area is covered this much area.

Last reply: Eddy Santosa, Sep 30, 2011, 8:05 pm

Record Time for ASHRAE appx G Simulation?

CS-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Aug 11, 2011, 12:33 pm

What's your record time? What software did you use?

Last reply: Marcus Sheffer, Sep 30, 2011, 8:04 pm

Submit in Design review but include manuf. cuts in Const Review

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Renee Shirey on Sep 23, 2011, 1:19 pm

The prereq requires manufacturer cut sheets for the accoustic materials. This is a state funded project and we cannot single-source products - we must offer contractors at least 3 manufacturers...

Last reply: David Posada, Sep 30, 2011, 4:47 pm

ANSI S12.60-2002 vs LEED Template

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Brian Moran on Sep 19, 2011, 2:42 pm

The ANSI S12.60-2002 standard requires that core learning spaces, between 10,000 and 20,000 cubic feet, have reverberation times that do not exceed .7 seconds. The LEED template states that...

Last reply: Daniel Hicks, Sep 30, 2011, 12:41 pm

Ceiling area

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by cathi schar on Sep 23, 2011, 9:12 pm

We have tectum panels (acoustic/insulation panels) above our beams. Do we have to add additional panels to the wall to make up for the ceiling area occupied by the exposed ceiling...

Last reply: Daniel Hicks, Sep 30, 2011, 12:29 pm

LEED 2009 Music Schools

Schools-2009 IEQp3: Minimum Acoustical Performance
posted by Brian Moran on Sep 19, 2011, 2:48 pm

IEQ p3 is a requirement of LEED for Schools 2009. I would like to see if anyone has worked on documenting compliance for a school under the ANSI standards calculations.

Specifically, it...

Last reply: Daniel Hicks, Sep 30, 2011, 12:13 pm