Log in
Forum
Topic

Spanish Lighting requirements

CI-2009 EAp2: Minimum Energy Performance
posted by MARIA GARCIA on Oct 5, 2011, 10:52 am

Dear all,

We have a CI project for 3 floors of a existing building. The scope of work includes the lighting and we have a problem with comply with ASHRAE. The Spanish regulations make us...

Last reply: Luis Miguel Diazgranados, Oct 11, 2011, 2:45 pm

Unable to Meet Pre-req during Current Performance Period

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Kristofer Kiszynski on Oct 11, 2011, 10:49 am

I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?...

Last reply: Ben Stanley, Oct 11, 2011, 12:49 pm

Baseline Vs Design Case

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Simon Sue on Aug 17, 2010, 11:26 pm

will it be ok for submission if my faucet deisgn case gpm is double the baseline standard.
we have a situation here, whereby we unable to find a local aerator which could fix into the...

Last reply: Kimberly Ja, Oct 10, 2011, 5:45 pm

LEED CI 2004, Credit 1.1 Optimize Energy Performance

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by David Rodriguez on Aug 17, 2011, 8:14 pm

When reviewing the CI forms from an older project that were filled out by a consultant, I noticed they had taken 10% credit towards the installed lighting power for occupancy sensor control of...

Last reply: Dan LeBlanc, Oct 10, 2011, 5:33 pm

Using a water table tank as a retaining method for compliance

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Gabriela Hernández Castillo on Oct 8, 2011, 1:27 pm

Our project is capturing rainwater and sending it to a water table tank (I don't know if this is the correct term, it is the tank that recieves water from the water table below foundations)....

Last reply: David Posada, Oct 10, 2011, 3:49 pm

LEED-Online Access

leedonline.com access - is it possible???
posted by Emily Catacchio on Oct 10, 2011, 11:47 am

Hi John,

You are correct that the latest version of LEED-Online does require you to use Internet Explorer. I'm a bit confused when you say "the browser tab closes." It is possible you need...

Last reply: John Garcia, Oct 10, 2011, 3:32 pm

Exceptional calculation- hot water use reduction in hotel

NC-2009 EAc1: Optimize Energy Performance
posted by Christine Robbins-Elrod on Oct 10, 2011, 12:56 pm

We're working on a hotel that will have a reduction in hot water consumption throughout the hotel (particularly in the guestrooms, where 2.0 GPM showerheads and 1.0 GPM faucet aerators will be...

Last reply: Marcus Sheffer, Oct 10, 2011, 3:20 pm

deleting old uploads when submitting a revision in LEED online?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Jessica Hawley on Sep 23, 2011, 11:06 am

We recently had some ...

Last reply: Susann Geithner, Oct 10, 2011, 2:35 pm

SSc7.2 Option 3

CS-2009 SSc7.2: Heat island effect - roof
posted by Markus Henning on Sep 28, 2011, 7:54 am

In my project I will achieve the requirements of SSc7.2 with option 3. The roof is covert by 10% green roof and 60% white gravel and ….. My question is if I don’t get the...

Last reply: Susann Geithner, Oct 10, 2011, 2:00 pm

What if there's no A/C.

NC-2009 EAp2: Minimum Energy Performance
posted by Patana Rattananavathong on Oct 6, 2011, 11:21 pm

What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?

Last reply: Marcus Sheffer, Oct 10, 2011, 12:09 pm