Topic | Recent |
---|---|
Schools project- large playing fields and open areaPilot-Credits PC14: Walkable Streetsposted by Helen Kessler on Sep 28, 2015, 11:44 am
Would a project with large playing fields and open area have any possibility of meeting this credit requirement? At one time the following requirement was not included for schools projects, but... |
|
Definition of street frontagePilot-Credits PC14: Walkable Streetsposted by Florian Schmidtchen on Sep 30, 2015, 4:41 am
What is the right definition of street frontage? In our project we have the site surrounded by streets on three sides, but on all three sides there are public sidewalks and green areas with trees... |
|
Amphitheater Occupancy for SS and WEGeneral forumsposted by Peter Doo on Sep 30, 2015, 1:50 pm
Amphitheater Occupancy Project Location: United States |
|
Pilot Credit UsabilityPilot-Credits MRpc52: Material multi-attribute assessmentposted by Chloe Bendistis on Oct 8, 2015, 2:57 pm
I have pursued this Pilot credit on several LEED projects over the past year and I'm happy to report that it has gotten significantly easier to document credit compliance. There are additional... |
|
Students K-12Calculating FTEsposted by Erin Holdenried on Oct 16, 2015, 10:45 am
For a K-12 school where each student will be there most of the day. Would the students be counted as... |
|
New Construction vs. Major RenovationGeneral forumsposted by Curtis Clark on Oct 20, 2015, 6:24 pm
I have a project which totally removes the building envelope, lighting/electrical system, and mechanical/plumbing system. Only the... |
|
Fair Housing ActPilot-Credits PC34: Design for Adaptabilityposted by Kenneth O'Brien on Oct 21, 2015, 3:26 pm
Why don't you just list the requirements for Fair Housing? The vague language of the list in the requirements is confusing. It would be nice to see blocking for grab bars included, and maybe... |
|
VOC MetersDiscuss the LEED Dynamic Plaque and Arcposted by Johanna Hendricks on Nov 4, 2015, 8:02 am
Has anyone purchased a meter for the annual... |
|
LEED V3 2009 SSc3- Asbestos contaminationGeneral forumsposted by Francis McNulty on Nov 13, 2015, 10:09 am
I have a project where two forms of asbestos contamination has been identified. One on pipework and the other in the existing floor slab adhesive - SSc3... |
|
Line of sight at intersectionsPilot-Credits PC14: Walkable Streetsposted by Katie Peterschmidt on Dec 11, 2015, 2:51 pm
Hello - has anyone had an issue with Requirement #9: where should the 50' tree spacing start from a busy intersection? We have an urban building with 3 facades, and the required vehicular line... |