Log in
Forum
Topic

GYM FLOOR PAINTS

Schools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
posted by Christian Nielsen-Palacios on Jun 10, 2010, 11:36 am

The color paints usually submitted for use on a gym floor seem to have very high...

Last reply: Josh Jacobs, Oct 20, 2011, 7:39 am

Project found old diesel tank

NC-2009 SSc3: Brownfield Redevelopment
posted by Tanja Arnesson on Oct 20, 2011, 3:57 am

Hi,

At the commencement of excavation work the project discovered an old diesel tank that had leaked. This meant that some of the soil was contaminated with diesel. The project took its...

Last reply: Larry Sims, Oct 20, 2011, 7:36 am

Turns off the light during the night

NC-2009 SSc8: Light Pollution Reduction
posted by Tanja Arnesson on Oct 20, 2011, 2:52 am

Hi,

I'm working on a project in Sweden where we talked about turing off the exterior light between 6pm and 6am. Will this help us meet the requirements or do we need to do all the...

Is Tenant commercial refrigeration units included?

NC-2009 EAc4: Enhanced Refrigerant Management
posted by Timo Rintala on Oct 18, 2011, 9:18 am

I'm currently working on a LEED NC project on a central university library projects. While the HVAC centralized cooling unist comply with the requirement, a question has arisen about tenant...

Last reply: Emily Catacchio, Oct 19, 2011, 9:05 pm

Hi, I have a project in the

EBOM-2009 WEc3: Water Efficient Landscaping
posted by matthew strong on Aug 17, 2011, 4:10 pm

Hi, I have a project in the NY zip code 10589 that has two types of irrigation:
1. Unmetered irrigation by retention pond for 58,094 SF of lawn and trees along the driveway
2. Metered...

Last reply: Ben Stanley, Oct 19, 2011, 4:49 pm

City Supplied Reclaimed Water

EBOM-2009 WEc3: Water Efficient Landscaping
posted by Nicholas Bradley on Aug 3, 2011, 10:42 pm

My project site is already utilizing reclaimed water for 100% of it's...

Last reply: Ben Stanley, Oct 19, 2011, 4:39 pm

Back up Energy source in Energy Modeling

CS-2009 EAc1: Optimize Energy Performance
posted by Paula Hernandez on Sep 2, 2011, 3:00 pm

I have an office building that will use solar pannels to generate hot sanitary water. But it will have an electric heaters aswell for back up. How can I consider this in my Model???.

Last reply: Marcus Sheffer, Oct 19, 2011, 1:10 pm

LEED Pressure Adjustment for Lab HVAC-Systems

CS-2009 EAc1: Optimize Energy Performance
posted by heinrich post on Sep 15, 2011, 10:26 am

Seems that some of my questions are not easy to answer.
Here is another question for the same lab project.

Fan system Power limitations are calculated according to Table 6.5.3.1.1A...

Last reply: Marcus Sheffer, Oct 19, 2011, 1:07 pm

Site boundary for light pollution credit

NC-2009 SSc8: Light Pollution Reduction
posted by Petra Hajná on Oct 19, 2011, 12:29 pm

For this particular credit there is an exemption on how to determine site boundary for zero lot line buildings, that you can use a curb line along the walls instead of normal site boundary as for...

modelling of tenant areas in a core and shell LEED project

CS-2009 EAc1: Optimize Energy Performance
posted by Puteri Shireen Jahnkassim on Oct 19, 2011, 10:32 am

Dear All, My question refers to the LEED Core and Shell modelling guidelines in Appendix 2 of the LEED BD&C guide.

Under the subheading 'tenant spaces' it states that ...'... if the...

Last reply: Marcus Sheffer, Oct 19, 2011, 12:27 pm