Log in
Forum
Topic

Would a Warehouse need to have Occupancy Sensors?

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Augusto Velazquez on Oct 5, 2011, 9:30 am

Our project includes an office area and a warehouse area. The office area will have occupancy sensors for each office, bathroom, corridors, etc. The warehouse will not have sensors. Do we have...

Last reply: Emily Catacchio, Oct 13, 2011, 10:35 pm

EAp2-Natural Ventilation v/s No HVAC

NC-2009 EAp2: Minimum Energy Performance
posted by Marcio Alberto Casado Pereira on Oct 13, 2011, 9:21 am

I am trying to determine if a project of an Industry ( "New Construction") without HVAC system get some special credit or if it is possible to obtain the 10% improvement between Baseline and...

Last reply: Marcus Sheffer, Oct 13, 2011, 2:45 pm

ID credits and LEED Online Forms

NC-2009 IDc1: Innovation in Design
posted by Laurie McEachern on Mar 3, 2011, 1:20 pm

We are attempting 5 innovative ID credits for a NC 2009 project. LEED Online is only allowing me to fill out one form for one credit. Am I missing something?

Last reply: Susan Walter, Oct 13, 2011, 2:35 pm

Automation Session at Greenbuild Shows Potential

General forums
posted by Nadav Malin on Oct 12, 2011, 9:23 pm

There's a live video now from the LEED Automation session at Greenbuild, at...

No New Parking- to document alternative compliance or not?

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Cynthia Ottenbrite on Oct 12, 2011, 12:53 pm

The project is an existing building - major renovation. The existing parking lot is being ripped up to drill the geothermal wells. The lot will then be repaved and restripped with fewer parking...

Last reply: Susan Walter, Oct 12, 2011, 3:56 pm

EBOM Recertificaton- one time assessments

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Habitech Distretto Tecnologico Trentino on Sep 7, 2011, 2:59 am

According to the TEMPORARY GUIDANCE FOR RECERTIFICATION UNDER LEED for EXISTING BUILDINGS: OPERATIONS & MAINTENANCE published by...

Last reply: Habitech Distretto Tecnologico Trentino, Oct 12, 2011, 9:19 am

Automatic Lighting Shut-off in Hotel Guest rooms

NC-2009 EAp2: Minimum Energy Performance
posted by Arub Vijay on Oct 11, 2011, 7:20 am

I have a hotel building with 150 keys aiming for LEED Silver..can anybody advise if all the guest rooms shall have automatic lighting shut-off controls (occupancy sensors, key/card controlled etc...

Last reply: Marcus Sheffer, Oct 12, 2011, 9:15 am

SRI for Corrugated metal roof

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Noriko Nagazumi on Oct 12, 2011, 1:49 am

Our project has corrugated metal roof like which can be shown by clicking the link below.
http://www.sakata-s.co.jp/product/88.html...

IAQ procedure

Schools-2009 IEQp1: Minimum indoor air quality performance
posted by Chad Saleeby on Jan 25, 2011, 10:37 am

Has anyone had any experience with...

Last reply: Alison Y Rivenburgh, Oct 11, 2011, 6:31 pm

PI Form 3- Occupant and Usage Data

General forums
posted by David Groseclose on Oct 11, 2011, 6:15 pm

Question was posted - I seem to be having trouble with this form. it continues to state that the form is not complete. Answer- Make sure all of the boxes that are blank have a zero in them....