Log in
Forum
Topic

Asphalt Roll Roof Recycling

CI-2009 MRc2: Construction Waste Management
posted by Sabrina B on Aug 17, 2011, 11:42 am

I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath. Does anyone know of a company in the southeast US (or...

Last reply: Tristan Roberts, Nov 8, 2011, 2:30 pm

LPD per fixure and zone lumen chart locations

Schools-2009 SSc8: Light Pollution Reduction
posted by Suzanne Allerton on Nov 8, 2011, 11:53 am

I am having difficulty finding these items. Our lighting rep is also
having this difficulty. Our particular fixtures are not on the
website previously mentioned. any suggestions?

Construction dates of bicycle networks

Pilot-Credits PC13: Bicycle Network, Storage, and Changing Rooms
posted by Carrie Johansen on Jun 30, 2011, 11:49 am

It seems like this information may not be readily available for many bicycle networks. Has anyone else had difficulty finding information regarding...

Last reply: Matthew Fortin, Nov 7, 2011, 5:16 pm

AV equipment

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Sheela I on Nov 3, 2011, 2:59 pm

Where can i check to see which AV equipment qualify for energy star.

Last reply: Emily Catacchio, Nov 7, 2011, 4:54 pm

EAc6 review comment.

EBOM-2009 EAc6: Emissions Reduction Reporting
posted by Jason Biondi on Jun 15, 2011, 3:41 pm

Has anybody recieved a comment on this credit along the lines of, "provide a summary of actions relating to energy efficiency and emissions reductions estimate the relative contribution of each...

Last reply: Jason Franken, Nov 7, 2011, 3:37 pm

Recycle Station

CI-2009 MRp1: Storage and Collection of Recyclables
posted by JENNIFER COMEAU on Nov 7, 2011, 2:16 pm

There's been a continuous question within our projects regarding the recycling situation. We provide (1) separate recycle/ storage room within our project (that meets the criteria for the s.f.)...

Last reply: JENNIFER COMEAU, Nov 7, 2011, 2:48 pm

Both electric heat pump and district energy, what system?

NC-2009 EAp2: Minimum Energy Performance
posted by Emma Eliasson on Nov 2, 2011, 3:43 am

I have a multifamily building which is supplied with heat from both an electric heat pump and district energy. How do I choose between system 1 and 2? Which rules do apply? The relation between...

Last reply: Marcus Sheffer, Nov 7, 2011, 2:14 pm

Seated height and systems furniture

NC-2009 IEQc8.2: Daylight and views - views
posted by Susan G. Drew on Nov 7, 2011, 12:27 pm

Given that systems furniture is now included in the calculation scope for IEQ8.2, does using industry-standard 42" high panels qualify as a 42" high line of sight?
And, if higher panels are...

FTE for Schools

Schools-2009 WEc3: Water Use Reduction
posted by David Mirabile on Sep 15, 2011, 9:51 am

When calculating the...

Last reply: Crissy Tsai, Nov 7, 2011, 12:12 pm

LEED Assessor & VOC Certification at the same Institution

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Nicolas Carbone on Nov 7, 2011, 10:07 am

Hi there:
I work at an institution member of the USGBC that offers several services among LEED certification.Some of this services include assesing projects in order to provide guidance...

Last reply: Tristan Roberts, Nov 7, 2011, 11:26 am