Log in
Forum
Topic

View outside vision glazing, LEED CI 2.0 project.

CI-2009 IEQc8.2: Daylight and views - views
posted by Rubén M. R. on Sep 14, 2011, 1:36 pm

Hi all,

Since I couldn't find a LEED CI 2.0 forum, I allow myself to write here (my apologies):

The vision of a multi-occupant office goes directly to a terrace which has a high...

Last reply: Tristan Roberts, Nov 20, 2011, 10:54 pm

EnergyStar in other countries

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Derek Fung on Dec 8, 2010, 11:03 pm

This old question again but with a new twist: As a project in China, all my project IT equipment checks out as EnergyStar due to using Dell and HP equipment. The only thing not compliant are the...

Last reply: Tristan Roberts, Nov 20, 2011, 10:37 pm

C&S building with partial occupancy during construction

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by Rubén M. R. on Aug 12, 2011, 6:22 pm

Our 23-story building is about to start partial occupancy at floor 12th.

The building's...

Last reply: Tristan Roberts, Nov 20, 2011, 10:35 pm

Scheduling for CS

CS-2009 IEQc3: Construction IAQ management plan - during construction
posted by BH . on Jul 12, 2011, 4:43 am

Dear all,

we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of...

Last reply: Tristan Roberts, Nov 20, 2011, 10:30 pm

Regional Materials- raw material

NC-2009 MRc5: Regional Materials
posted by Felipe Duran on Oct 7, 2011, 12:35 pm

Hello, we are working on a project that aims to get the LEED NC-2009 certification. We used a stone removed from the site to compose some walls, and therefore has no cost. How this material could...

Last reply: Nadav Malin, Nov 20, 2011, 10:21 pm

PVmodules for generate of onsite renewable energy and REC

NC-2009 EAc2: On-Site Renewable Energy
posted by Florian Schmidtchen on Nov 17, 2011, 9:15 pm

For a NC manufacturing project we have been aproached by a company who would mount pv-modules on the building roof and sell them to building owner at no cost premium.
My question is if...

Last reply: Florian Schmidtchen, Nov 20, 2011, 10:20 pm

LEED CI Retail- Restaurant Kitchen Equipment

CI-2009 MRc4: Recycled Content
posted by Susie Spivey-Tilson on Nov 17, 2011, 4:26 pm

We are doing the MRc4 and MRc5 calcs for a restaurant i that is using the LEED CI 2009 Retail rating system.

It is not clear to us whether or not we have to use the kitchen equipment...

Last reply: Tristan Roberts, Nov 20, 2011, 10:19 pm

Adaptive Reuse

NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Christine Robbins-Elrod on Aug 1, 2011, 3:51 pm

We're working on the adaptive...

Last reply: Tristan Roberts, Nov 20, 2011, 9:44 pm

Option 2: Stream Protection Plan

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Robert Thuston on Aug 2, 2011, 5:23 pm

I apologize if the requested information is included on this site but I have not seen it to this point. Can anyone give me a definition of what constitutes a stream channel? We are looking at a...

Last reply: Tristan Roberts, Nov 20, 2011, 9:31 pm

what is the difference between? and how could i measure???

General forums
posted by ola shunnar on Nov 19, 2011, 6:29 am

what is the difference between the Gross square footage undergoing initial fit-out;...

Last reply: Tristan Roberts, Nov 20, 2011, 9:08 pm