PVmodules for generate of onsite renewable energy and REC

NC-2009 EAc2: On-Site Renewable Energy
posted by Florian Schmidtchen on Nov 17, 2011, 9:15 pm

For a NC manufacturing project we have been aproached by a company who would mount pv-modules on the building roof and sell them to building owner at no cost premium.
My question is if...

Last reply: Florian Schmidtchen, Nov 20, 2011, 10:20 pm

LEED CI Retail- Restaurant Kitchen Equipment

CI-2009 MRc4: Recycled Content
posted by Susie Spivey-Tilson on Nov 17, 2011, 4:26 pm

We are doing the MRc4 and MRc5 calcs for a restaurant i that is using the LEED CI 2009 Retail rating system.

It is not clear to us whether or not we have to use the kitchen equipment...

Last reply: Tristan Roberts, Nov 20, 2011, 10:19 pm

Adaptive Reuse

NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elements
posted by Christine Robbins-Elrod on Aug 1, 2011, 3:51 pm

We're working on the adaptive...

Last reply: Tristan Roberts, Nov 20, 2011, 9:44 pm

Option 2: Stream Protection Plan

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Robert Thuston on Aug 2, 2011, 5:23 pm

I apologize if the requested information is included on this site but I have not seen it to this point. Can anyone give me a definition of what constitutes a stream channel? We are looking at a...

Last reply: Tristan Roberts, Nov 20, 2011, 9:31 pm

what is the difference between? and how could i measure???

General forums
posted by ola shunnar on Nov 19, 2011, 6:29 am

what is the difference between the Gross square footage undergoing initial fit-out;...

Last reply: Tristan Roberts, Nov 20, 2011, 9:08 pm

Not Eligible for ENERGY STAR rating- Case 2 option 1 calculator

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by gwenedd murray on Oct 26, 2011, 1:08 pm

Our project is below 5,000sf which makes it automatically not eligible for an ENERGY STAR rating. There are two distinct space types, office + K-12 classroom. Based on this information, the...

Last reply: Jenny Carney, Nov 20, 2011, 10:42 am

Using Portfolio Manager: area to consider

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Marcio Alberto Casado Pereira on Oct 25, 2011, 10:40 pm

We are experiencing difficulties in acquiring a coherent rating from Portfolio Manager for a Hospital in São Paulo, Brazil.

As we input all the data, PM is giving us a rate of 100, which...

Last reply: Jenny Carney, Nov 20, 2011, 10:31 am

Classroom and Lecture Halls Building on a University Campus

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Lisa Chow on Jun 24, 2011, 3:31 pm

Hello,
My building is located on a university campus and contains just 2 classrooms and 3 lecture halls (~15.5 ksf). It's a relatively new building constructed in 2007.

Based on...

Last reply: Jenny Carney, Nov 20, 2011, 10:26 am

Changing peformance period after initial GBCI review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Jessica Hawley on Oct 14, 2011, 3:16 pm

Is it acceptable to change the peformance period after an initial...

Last reply: Jenny Carney, Nov 20, 2011, 9:48 am

Public Transportation Park and Rides

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Wendy Gibson on Nov 15, 2011, 1:25 pm

Many tenants in our building use public transportation park and rides. They drive to a specific location, park their car and get on public transit for the rest of their commute. Its does not...

Last reply: Dan Ackerstein, Nov 20, 2011, 8:55 am