Topic

refrigerant reccovery

NC-2009 EAp3: Fundamental Refrigerant Management
posted by Faisal on Jul 29, 2017, 8:54 am

in EAp3 it says that there should be an EPA approved refrigerant recovery technician, is this requirement also for temporary units(like site offices site warehouse etc) or it is only for...

Last reply: Trista Brown, Aug 28, 2017, 5:44 pm

ROCKY SOIL

NC-v4 SSc2: Site development - protect or restore habitat
posted by soha yamani on Apr 30, 2017, 9:49 am

in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ? the site is previously developed, however the soil tests have shown rocky soil and the site...

Last reply: Trista Brown, Aug 28, 2017, 2:37 pm

Report Contents

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Omar Elrawy on Aug 27, 2017, 11:17 am

Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room. For this purpose I'm preparing a report for each space stating the...

A partial ceiling area was affected by mold

Schools-2009 IEQc10: Mold Prevention
posted by dia2000@gmail.com dia2000@gmail.com on Apr 11, 2017, 12:19 pm

Hello,
Our project is a LEED NC v2009. Due to a heavy rain season, it happened that some leakage lead to a partial grow of mold in some ceiling areas which are made from gypsum boards. The...

Last reply: Tristan Roberts, Aug 26, 2017, 8:10 pm

smoke leakage test for duct

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Abdulla Anwar on Feb 26, 2017, 12:29 am

Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from...

Last reply: Tristan Roberts, Aug 26, 2017, 4:59 pm

Roof Water Feature

NC-v4 SSc5: Heat Island Reduction
posted by Omer Moltay on May 5, 2017, 6:49 am

Dear All,
My project is a museum building. The building roof is thick with water. So, project building roof have pool and observation terrace. Should it be counted as a reflective? Do I...

Last reply: Tristan Roberts, Aug 26, 2017, 8:20 am

LEED CI v3- Ofice- Energy Model. Please Advise

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by SSN Energy Model on Aug 14, 2017, 7:29 am

Hi,
I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+M+3 Floors. Our tenant spaces are located in 1st Floor. Tenant’s spaces are conditioned by...

Last reply: Marcus Sheffer, Aug 23, 2017, 2:08 pm

Future-proofing LEED certification- Iran

General forums
posted by Meike Borchers on Apr 19, 2017, 4:21 am

I have a slightly different question in regarding to certifiable projects. One of our clients is keen to get a project in Iran LEED certified, however for political reasons it is not currently...

Last reply: Tristan Roberts, Aug 10, 2017, 4:04 pm

Powder products mixed with water on site application

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Ranya Metwalli Shields on Aug 1, 2017, 5:45 am

We are pursuing Credit IEQc4.1 in LEED NC v2009 for low emitting adhesives and...

Last reply: Ranya Metwalli Shields, Aug 7, 2017, 7:13 am

Multiple Metro Stations

LEED Rating System Selection
posted by MERVE AYGENC on Jul 18, 2017, 3:58 am

Dear all! I need some help in deciding the registration type of multiple metro stations. There are 11 stations to be certified and I cannot decide whether all of them should be registered as...

Last reply: Puneet Mital, Jul 30, 2017, 9:25 am