Log in
Forum
Topic

Part II AGMBC timeline

LEED Guidance for Campuses and Multiple Buildings
posted by Melissa Merryweather on Nov 4, 2011, 12:45 am

Glad to finally get the partial update to Part II. Frustrated to see that the on-line advice on fees still relates to Part I, nothing on Part II yet.
Is there any advice on whether this...

Last reply: Melissa Merryweather, Dec 2, 2011, 7:04 pm

waste auditing timeline

EBOM-2009 MRc6: Solid waste management - waste stream audit
posted by Rachael McClain on Mar 31, 2010, 2:15 pm

Hi, I was wondering about the timeline. The reference guide reccomends performing the waste audit early in the performance period so improvements can be made over most of ther performance period...

Last reply: Barry Giles, Dec 2, 2011, 4:59 pm

Naturally Ventilated Corridors

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Matthew Macko on Nov 30, 2011, 3:53 pm

Do corridors need to have access to operable windows within 25 feet?

Last reply: Dylan Connelly, Dec 2, 2011, 2:56 pm

Exterior Lighting Trespass for Campus Project

NC-2009 SSc8: Light Pollution Reduction
posted by Omer Moltay on Dec 2, 2011, 2:09 pm

We are working on a mixed use development where we have to achieve this credit for two buildings (with facade lighting) on a master site, but the buildings are only 16 m. apart from each other....

ASHRAE 90.1- Mandatory Provision 10.4

CI-2009 EAp2: Minimum Energy Performance
posted by Ricardo Sobral on Dec 2, 2011, 8:21 am

If EPAct 1992 does not reference 50Hz electrical motors, these don't need to comply with 10.4 minimum efficiencies?
Thanks in advance.

Last reply: Marcus Sheffer, Dec 2, 2011, 11:09 am

LEED plaques not included for v2 projects

General forums
posted by Tristan Roberts on Nov 13, 2011, 9:36 pm

Brian, thanks for noting this. Here is the rest of the GBCI...

Last reply: Angie Plantz, Dec 2, 2011, 10:58 am

IEQp1 compliance for high-rise with 1 outdoor air intake

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Dawn Brenner on Apr 27, 2011, 2:06 pm

The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007. The building has only one...

Last reply: David Hubka, Dec 2, 2011, 10:08 am

LEED NC 2.2 – Sunset Date

LEED Rating System Selection
posted by Bryan Waters on Dec 1, 2011, 10:29 am

We have a project registered under LEED NC 2.2- After completion of Construction Documents of Phase 1; the project went on hold over a year ago. No submittals have been made to...

Last reply: Susan Walter, Dec 2, 2011, 9:08 am

SSc2 Option2

CI-2009 SSc2: Development Density and Community Connectivity
posted by Holly Himes on Sep 12, 2011, 6:34 pm

Does the entire residential area within the 1/2 mile radius need to be 10 units per acre or more or just a selection of higher...

Last reply: Susan Walter, Dec 2, 2011, 8:59 am

Documenting the credit...

CI-2009 SSc2: Development Density and Community Connectivity
posted by Jennifer Berthelot-Jelovic on Nov 28, 2011, 6:28 pm

I am currently submitting for a LEED CI v3.0 project and need to document the Development Density. I have no issues with Community Connectivity. That being said, how do I find the numbers that...

Last reply: Susan Walter, Dec 2, 2011, 8:58 am