Dedicated Open Space separate from the project site

NC-2009 SSc5.2: Site development - maximize open space
posted by Laurie Hammack on Oct 21, 2010, 12:42 pm

Our project is in a previously developed urban site and we do not have an opportunity on the project site to provide the percentage of open space required.

Our project is for a department...

Last reply: Renee Shirey, Dec 5, 2011, 10:58 am

LEED V4

General forums
posted by ola shunnar on Dec 4, 2011, 1:39 am

I am wondering about LEED v4, when its come up? and could I register the project under V3 even there is a V4??

Last reply: Susan Walter, Dec 5, 2011, 9:18 am

Seats in a Sports Arena

NC-2009 MRc4: Recycled Content
posted by Carolina Vergnano on Dec 2, 2011, 12:50 pm

Hello there,

We all know that furniture does not need to be included in the Materials & Resources credits, right?

However, in a Sports Arena where seats are a permanent element...

Last reply: Susan Walter, Dec 5, 2011, 9:12 am

5 Year Window and ASHRAE audit v. Cx

EBOM-2009 EAc2.2: Existing building commissioning - implementation
posted by Jenny Carney on Jun 8, 2011, 5:16 pm

All - I always thought that they 5-year exception to the performance period rules on pg. 172 of the reference guide could likely be used for either option,...

Last reply: Shane Mason, Dec 5, 2011, 7:52 am

timeline for investigation and analysis

EBOM-2009 EAc2.1: Existing building commissioning - investigation and analysis
posted by Pablo Fortunato Suarez on May 8, 2011, 11:37 pm

My clients have prepared six-sigma projects for improvement that have a timeline of 5 years (since 2006). The building is 20 yrs old and even back then, facilities management had been re-...

Last reply: Shane Mason, Dec 5, 2011, 7:49 am

Timing

EBOM-2009 EAc2.1: Existing building commissioning - investigation and analysis
posted by Jessica Bruscato on Oct 24, 2011, 6:16 pm

I am pursuing certification for an existing convention center that is connected to a hotel. The hotel has a central plant that serves the convention center. This plant along with the entire...

Last reply: Shane Mason, Dec 5, 2011, 7:36 am

Tradable Surfaces

CS-2009 SSc8: Light Pollution Reduction
posted by Anna Korinkova on Dec 5, 2011, 5:42 am

Hi,
our project does not have any tradable surfaces and because of this the online pdf says that the SSc8 is not properly documented (data are missing in the tradable surfaces table)....

Sealant for Joints

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Maya Karkour on Nov 23, 2011, 3:39 am

Hi,

I am was wondering if the...

Last reply: Nadav Malin, Dec 3, 2011, 4:31 pm

MR c3.2 Materials Reuse- Furniture & furniture

CI-2009 MRc3.2: Materials reuse - furniture and furnishings
posted by Pamela Branch on Dec 1, 2011, 9:15 pm

My client is a small non-profit, and on a shoe string budget. They are using used or donated furniture for 100% of their Furniture/Furnishings. I'm having trouble with the table indicating that...

Last reply: Pamela Branch, Dec 2, 2011, 11:53 pm

LEED for District Cooling Plant

LEED Rating System Selection
posted by Banafsheh Shobeiri on Oct 6, 2011, 4:01 am

We are working on a DCP with associated parking space and a minor office space. Is LEED NC appropriate for this utility building? If so, is there a minimum floor area requirement for the offices...

Last reply: Karen Joslin, Dec 2, 2011, 8:30 pm