Combination of Steep-Slope and Low-Slope RoofNC-2009 SSc7.2: Heat island effect - roofposted by Tysa Tenebro on Apr 20, 2010, 8:56 am
We have a project that have steep-slope and low-slope roofs. What are the requirements for this credit SSc7.2? Am I going to follow with the low-slope:... Last reply: Yetsuh Frank, Dec 15, 2011, 3:31 pm |
|
emergency exterior lightingNC-2009 SSc8: Light Pollution Reductionposted by Iris Amdur on Dec 15, 2011, 2:58 pm
Are there any circumstances where emergency exterior lighting would be exempt from credit requirements? |
|
Permeable Paving- "vegetated open space"NC-2009 SSc5.2: Site development - maximize open spaceposted by Lauren Sparandara on Mar 21, 2011, 3:50 pm
If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2? We aren't achieving SSc2 so we cannot technically... Last reply: Manny Iglesia, Dec 15, 2011, 2:17 pm |
|
Definition of Site Area?NC-2009 SSc5.2: Site development - maximize open spaceposted by Ellen Mitchell on Apr 11, 2011, 4:06 pm
This may be a dumb question, but I have a project that falls under Case 3 - provide vegetated open space equal to 20% of the project's site area. I can't find any credit language that says... Last reply: Manny Iglesia, Dec 15, 2011, 2:08 pm |
|
Reflecting PoolNC-2009 SSc5.2: Site development - maximize open spaceposted by Rosana Correa on May 9, 2011, 2:08 pm
Hello everyone! Will areas covered with reflecting pools count as open space areas? Thanks! Last reply: Manny Iglesia, Dec 15, 2011, 1:56 pm |
|
Commercial Kitchen hand washing sinksCI-2009 WEc1: Water Use Reductionposted by ANDREW MOISEEV on Dec 15, 2011, 11:56 am
Are the hand wash sinks included in the 20% reduction requirement? Last reply: Seema Pandya, Dec 15, 2011, 12:05 pm |
|
VOC Limit Table- LEEDuser and Reference GuideCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Rand Ekman on Feb 7, 2010, 1:48 pm
I'm wondering whether the... Last reply: Reid Middlebrooks, Dec 15, 2011, 11:20 am |
|
Spec Sections vs. LEED Credits checklist?General forumsposted by John Ida on Dec 14, 2011, 3:32 pm
http://www.masterspec.com/users/specifying_leed_requirements.php ARCOM offers some sort of checklist or... Last reply: Susan Walter, Dec 15, 2011, 9:39 am |
|
lighting and plug loads separate?CS-2009 EAc5.2: Measurement and verification - tenant submeteringposted by Markus Henning on Oct 4, 2011, 9:54 am
I am working on a LEED-CS 2009 project. We will reach Credit EA 5.2 Measurement and Verification – Tenant... Last reply: BH ., Dec 15, 2011, 6:06 am |
|
Option 1: Without tenant, does not meet pre-requisite.CS-2009 EAp2: Minimum Energy Performanceposted by Whitney Dorn on Dec 13, 2011, 2:36 pm
The client is developing without a tenant and is deferring major HVAC components to the tenant build-out (air handlers.) Without air handlers, the energy model does not meet pre-requisite with... Last reply: Marcus Sheffer, Dec 14, 2011, 2:16 pm |