Log in
Forum
Topic

EBOM 2009 PI Form 2

General forums
posted by Vernal Group on Dec 21, 2011, 12:46 pm

Does anybody know why this form wants a breakdown of new construction, existing renovated, and existing unrenovated? We are working on a 20 year old building, and over 20 years I am sure that...

Last reply: Vernal Group, Dec 28, 2011, 6:07 pm

ENERGY STAR vs PIf3 Occupant Count

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Alexis Thompson on Dec 2, 2011, 6:31 pm

Our project is currently pursuing LEED. We received an ENERGY STAR label for the 12-month period ending June 30th 2011 with a rating of 81. We plan to submit for our LEED certification in May...

Last reply: Jubilee Daniels, MLA, LEED AP O+M, Dec 28, 2011, 2:38 pm

Standard baseline for each piece of medical equipment

NC-2009 EAp2: Minimum Energy Performance
posted by James Chueh on Dec 27, 2011, 11:41 am

I am building a model for healthcare project and trying to save energy use as much as possible, but the energy use of medical equipment is huge. There are some comments about finding the standard...

Last reply: Marcus Sheffer, Dec 28, 2011, 10:51 am

Exterior LIghting- ASHRAE 90.1 Mandatory Provisions

CS-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Dec 22, 2011, 3:57 am

Dear all,

We know for the fact that for interior lighting:
"Trade-offs among building area types are permitted provided that the total installed interior lighting power does not...

Last reply: Christopher Schaffner, Dec 28, 2011, 10:32 am

Defining "Underground"

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Maya Karkour on Dec 15, 2011, 6:43 am

Dear all,

I have a car parking for my school whose roof serves as a playground for kids:

1) Can I consider this parking to be "Underground" and be exempted from the...

Last reply: Maya Karkour, Dec 28, 2011, 9:57 am

LEED Homes vc LEED NC anyone??

LEED Rating System Selection
posted by Gregory Minott on Dec 27, 2011, 3:43 pm

I am currently in the process of determining which LEED rating system will be best for my project. The project consists of 11 existing multifamily buildings on different sites all on the same...

Last reply: Gregory Minott, Dec 27, 2011, 4:15 pm

CI for a residential home

LEED Rating System Selection
posted by Emmanuel Pauwels on Dec 21, 2011, 11:35 am

We are evaluating an international (non-US) project that would like to build 2 separate buildings on one single site. One building is a hotel which measures 50.000 ft2 and the second building is...

Last reply: Tristan Roberts, Dec 27, 2011, 3:55 pm

Pilot Credit

Pilot-Credits EApc3: Medical and process equipment efficiency
posted by Dan Forino on Dec 23, 2011, 11:06 am

If we have a LEED Project that was pursuing a Pilot Credit but without knowing that it was a Pilot Credit, and are at the Submission Phase can we still apply for this credit. Basically the Owner...

Last reply: Marcus Sheffer, Dec 27, 2011, 12:04 pm

Interior Lighting_24-hour operation project

NC-2009 SSc8: Light Pollution Reduction
posted by Seunghyun Cha on Dec 26, 2011, 8:40 pm

Hi,
I'm working on a LEED v3 project and We have an issue complying with this credit.
Our project is basically a 24-hour operation project, however, some spaces do not operate for 24...

Pilot Credit 9

Pilot-Credits PC9: Street Network
posted by Jeffrey Lewis on Dec 22, 2011, 2:42 pm

I'm not sure why this point is necessary, to be completely honest. LEED already has community connectivity points to show neighborhood walkability, mass transit points to further show a minimized...