Log in
Forum
Topic

Define Movable Furnishings of IAQ Testing

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Holly Himes on Nov 30, 2011, 2:44 pm

The Reference Guide states movable furnishing such as workstations and partitions must be in place during...

Last reply: Tristan Roberts, Dec 17, 2011, 11:36 pm

Indoor Carpet Adhesives

CI-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Colleen Ice on Oct 6, 2011, 3:16 pm

Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives. Do I put them under both categories or just 4.3?
Right now I have duplicate...

Last reply: Tristan Roberts, Dec 17, 2011, 11:35 pm

Does it matter where to install occupancy sensors

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Steve Khouw on Jun 14, 2011, 10:55 pm

To earn this credit for Strategy 3, does it matter where we locate the sensors so long as we meet the minimum 75% connected light loads, right? The obvious choices would be in non-regularly...

Last reply: Tristan Roberts, Dec 17, 2011, 11:10 pm

Future Contract for SSc5

EBOM-2009 SSc5: Site development - protect or restore open habitat
posted by Frederick Freeman on Dec 17, 2011, 4:32 pm

We are currently pursuing...

Last reply: Tristan Roberts, Dec 17, 2011, 10:50 pm

Authentication of water fixture installation date

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by David Mortensen on Sep 8, 2011, 1:32 pm

Had anyone successfully used as-built drawings to verify the installation date of water fixtures? On this page, the Checklist states that,

"Formal authentication of the fixture upgrade...

Last reply: Emily Catacchio, Dec 17, 2011, 7:56 pm

Cost per Item/Number of Items Purchased Inquiry

Schools-2009 MRc4: Recycled Content
posted by Michael Kros on Dec 14, 2011, 3:49 pm

This question pertains to all of the following credits: MRc3, MRc4, MRc5, MRc6, MRc7, and IEQc4.

In order to document each of these credits, the forms on LEED Online asks you to indicate...

Last reply: Nadav Malin, Dec 17, 2011, 8:28 am

Exotic plants

EBOM-2009 SSc5: Site development - protect or restore open habitat
posted by Matthew Perna on Mar 4, 2011, 3:36 pm

2011- 11:21 am Thanks for your thoughts Tristan. I will let the forum know how it goes. Log in or register to post comments American University Sustainability American University LEEDuser Basic Member 56...

Last reply: Tristan Roberts, Dec 16, 2011, 11:16 pm

OnSIte Renewable Energy Limitations

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Janna Nash on Dec 6, 2011, 2:07 pm

My EBOM project...

Last reply: Tristan Roberts, Dec 16, 2011, 11:07 pm

Reporting offset purchases on form EAc4

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Michael Miller on Mar 7, 2011, 12:23 pm

The reference guide is explicit that if you are purchasing off-site...

Last reply: Tristan Roberts, Dec 16, 2011, 11:04 pm

OPTION 3- Survey Time

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by WAGNER OLIVEIRA SILVA on Nov 30, 2011, 2:57 pm

We have same dubs about survey time. The LEED EB: O&M 2009 Reference guide inform that the survey must be conduct either (1) each day over 5 consecutive workdays or (2) at the conclusion of 5...

Last reply: Tristan Roberts, Dec 16, 2011, 10:17 pm