Interior Lighting_24-hour operation project

NC-2009 SSc8: Light Pollution Reduction
posted by Seunghyun Cha on Dec 26, 2011, 8:40 pm

Hi,
I'm working on a LEED v3 project and We have an issue complying with this credit.
Our project is basically a 24-hour operation project, however, some spaces do not operate for 24...

Pilot Credit 9

Pilot-Credits PC9: Street Network
posted by Jeffrey Lewis on Dec 22, 2011, 2:42 pm

I'm not sure why this point is necessary, to be completely honest. LEED already has community connectivity points to show neighborhood walkability, mass transit points to further show a minimized...

LCA and Renovating an Existing Building

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Dana Murdoch on Sep 30, 2011, 11:15 am

I am considering using this pilot credit for a renovation project of a residence hall. Does anyone have an opinion if this would make sense?

Some background - The residence hall is going...

Last reply: Sara Goenner Curlee, Dec 22, 2011, 12:34 pm

I'm working on finalizing

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Heather Anderson on Dec 21, 2011, 4:04 pm

I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings. However, all the installed ballast are dimmable and all...

Last reply: Dane Sanders, Dec 21, 2011, 7:17 pm

If you are registered for

General forums
posted by Francis Chua on Dec 21, 2011, 4:26 pm

If you are registered for LEED v2.2, then you must follow AGMBC, 2005. As you mentioned, all 4 buildings must independently meet the requirements for the EQ credits. For the 2 buildings that are...

Rec Center

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Meredith Hunt on Jan 26, 2011, 4:58 pm

I am working on a potential recreation center and am a little confused on how individual controls would work in a space like this. The majority of the building is a big open space with 4...

Last reply: Lauren Sparandara, Dec 21, 2011, 3:35 pm

Shower FTE Question

CI-2009 SSc3.2: Alternative transportation - bicycle storage and changing rooms
posted by JENNIFER COMEAU on Dec 21, 2011, 1:41 pm

Our tenant has purchased a bike rack just for their suite, and appropriate signage has been installed. When working on the credit template, I am able to input the # of secure bike racks and the...

Last reply: JENNIFER COMEAU, Dec 21, 2011, 2:19 pm

Multiple buildings including residential

LEED Guidance for Campuses and Multiple Buildings
posted by Emmanuel Pauwels on Oct 25, 2011, 8:02 am

We would like to use the multiple buildings approach for an international project that includes a site with a hotel and one residential single family home which belongs to the owner of the hotel...

Last reply: Emmanuel Pauwels, Dec 21, 2011, 12:02 pm

I have posted this in an

LEED Rating System Selection
posted by Lee Dingemans on Dec 16, 2011, 12:01 pm

I have posted this in an other area of LEED User as well but maybe I will get more responces with this one. We need to register a project for one of our clients and am not sure what the best...

Last reply: Lee Dingemans, Dec 21, 2011, 9:16 am

Project Boundaries and New ROW

General forums
posted by Sam Watters on Dec 20, 2011, 2:10 pm

Hello,

The project that I'm working on is going to involve construction of additional rights of way in the form of a collector street/woonerf running through the project and connecting to...