Health Club FacilityNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Sara Neff on Jan 9, 2012, 8:21 pm
Does anyone know what documentation we provide to prove that .5% of the... Last reply: David Posada, Jan 13, 2012, 12:55 pm |
|
Table EAc1.3-2CI-2009 EAc1.3: Optimize energy performance - HVACposted by Jason Dubose on Jan 5, 2012, 8:08 pm
Are we to include lighting and small power line items in this table and electrical equipment for a data center? The table lists "HVAC" energy uses which these are not, but ASHRAE 90.1 and our... Last reply: Marcus Sheffer, Jan 13, 2012, 12:55 pm |
|
Bypaas VAVs and AHUsCI-2009 EAc1.3: Optimize energy performance - HVACposted by monu goyal on Jan 11, 2012, 5:51 am
Hello to all, my query is our project is two floors in a 9 floor building. The... Last reply: Marcus Sheffer, Jan 13, 2012, 12:41 pm |
|
Determining Baseline System TypeCI-2009 EAc1.3: Optimize energy performance - HVACposted by Rebekah Burke on Jan 13, 2012, 11:41 am
I am trying to correctly determine the baseline system for my LEED energy model. I have a 7-story hotel building so it will either be System 1- PTAC or System 2 –PTHP based on ASHRAE 90.1-2007... Last reply: Marcus Sheffer, Jan 13, 2012, 12:38 pm |
|
Specific LanguageEBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by SIG - Sustainability Main Account on Jan 13, 2012, 10:09 am
Our signage currently reads: Just received this comment from the... Last reply: SIG - Sustainability Main Account, Jan 13, 2012, 12:27 pm |
|
Check with GBCIGeneral forumsposted by Tristan Roberts on Apr 9, 2010, 10:26 am
Christopher, this sounds frustrating! I have not had this problem, myself. You've probably already done this, but I would recommend you follow up with... Last reply: Sabrina B, Jan 13, 2012, 12:22 pm |
|
EAp2 and EAc1 Reviews and AppealsLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Cynthia Estrada on Dec 5, 2011, 3:49 pm
Below is an excerpt from a communication I recently received: " We are seeing a trend towards multiple submittals and appeals from... Last reply: Susann Geithner, Jan 13, 2012, 9:30 am |
|
Do building showers count?CI-2009 WEp1: Water Use Reductionposted by robert moylan on Mar 31, 2010, 10:25 am
We are working on the prereq. and are at 28%. If we add a low flow shower head to the... Last reply: Diana Nezamutinova, Jan 13, 2012, 9:23 am |
|
Pilot Credit #45Pilot-Credits SSpc45: Site assessmentposted by Jill DeMarotta on Jan 13, 2012, 8:34 am
I think this is a good credit. I just wish there was a way to ensure that the information gathered through this process is at the very beginning of the project to positively affect the design,... |
|
Duration in lavatory faucets – 15 or 30 seconds?CS-2009 WEp1: Water Use Reductionposted by Maria Porter on Sep 1, 2011, 6:32 am
On LEED Online and in the Reference Guide one use of a lavatory faucet is 15 seconds. In the Water Use Reduction Additional Guidance (updated July 14, 2011) page 3, the duration of a lavatory... Last reply: Maria Porter, Jan 13, 2012, 4:19 am |