Topic | Recent |
---|---|
Alternative Transportation Survey Results Calculator- ErrorEBOM-2009 SSc4: Alternative Commuting Transportationposted by Tyler Farmer on Jan 11, 2012, 2:41 pmI tried the other settings (Auto Except for Data Tables and Manual) and they did not resolve the error message either. I will look at some excel forums to see if I can find a solution. Thanks. Log... Last reply: Klaus Zednik, Jan 23, 2012, 10:23 am |
|
Light trespass from pedestrian access routesCS-2009 SSc8: Light Pollution Reductionposted by Magnus Stagnäs on Jan 23, 2012, 9:39 am
In our project (LZ3) we have a separate pedestrian route accessing the site. The local government requires the route to be sufficiently illuminated, which means that the... |
|
geothermal systemNC-2009 MRc4: Recycled Contentposted by Emmanuel Pauwels on Jan 15, 2012, 1:01 am
Our project includes a geothermal system. When calculating the total material cost I wonder in which division of the CSI masterformat should the cost of this system be accounted for. The... Last reply: Tim Crowley, Jan 21, 2012, 10:58 am |
|
incorporating materials from Divisions outside 2-10, 31 & 32NC-2009 MRc4: Recycled Contentposted by Christopher Sawyer on Apr 16, 2010, 12:03 pm
Although the Credits state that MEP and other products should be excluded, may they be included in the calculations if desired? I have the opportunity to get... Last reply: Tim Crowley, Jan 21, 2012, 10:56 am |
|
Cost info on LEED EBOMGeneral forumsposted by James Doyle on Jan 20, 2012, 3:15 pm
For LEED EBOM cost... |
|
Credit for Sustainable Forestry Initiative (SFI) certified wood?NC-2009 MRc7: Certified Woodposted by Tim Casper on Jan 18, 2012, 12:22 pm
Past CIRs indicate LEED does not recognize SFI as an alternative to the... Last reply: Tristan Roberts, Jan 20, 2012, 2:32 pm |
|
Audit reccommendation to turn off zoneEBOM-2009 WEc3: Water Efficient Landscapingposted by SIG - Sustainability Main Account on Jan 19, 2012, 12:23 pm
We performed a full audit of the irrigation system and some of the findings were to turn off zones that are watering established plants or mulch areas. This creates a lot of savings in real life... Last reply: Dan Ackerstein, Jan 20, 2012, 1:29 pm |
|
Parking on previously developed siteNC-2009 SSc4.4: Alternative transportation - parking capacityposted by Mary Frances Stotler on Jan 10, 2012, 10:58 am
Our project is an addition to an existing facility in a previously developed site (existing facility will not be certified, only the new addition). Originally the entire site (pre-new addition)... Last reply: Larry Jones, Jan 20, 2012, 12:28 pm |
|
Existing Parking on a developed site.NC-2009 SSc4.4: Alternative transportation - parking capacityposted by Rod Barker on Jan 17, 2012, 5:43 pm
My question is related to SS credit 4.4 and SS credit 4.3. We have a previously developed site, including existing parking spaces, with an empty building pad where a new health clinic will be... Last reply: Larry Jones, Jan 20, 2012, 12:26 pm |
|
Utility Service Changed During ConstructionNC-2009 EAp2: Minimum Energy Performanceposted by Candice Rogers on Jan 20, 2012, 9:45 am
Hello - Last reply: Candice Rogers, Jan 20, 2012, 11:05 am |