Building Not Eligible for Energy Star Benchmarking- Outside U.SEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Amgad Khattab on Dec 30, 2011, 11:38 pm
Our building is located in Egypt. It is a training facility specialized in IT programs for post-graduates and it is not eligible for Energy Star Benchmarking and the national average source... Last reply: Dan Ackerstein, Feb 2, 2012, 11:41 am |
|
Can a smoking room be regarded as regulary occupied space?CI-2009 IEQc8.2: Daylight and views - viewsposted by Noriko Nagazumi on Jan 29, 2012, 8:17 pm
The definition of "regulary occupied space" is described as following; Last reply: Jill Dalglish, PE, Feb 2, 2012, 11:39 am |
|
Omitting an area from the buildingGeneral forumsposted by Mike D on Jan 31, 2012, 6:31 am
We are certifying an office building and there is one retail space at the ground floor of the building that the project team wants to omit from LEED certification. Can this be achieved? How? Last reply: Mike D, Feb 2, 2012, 11:32 am |
|
Lighting Fixture of equipment rooms in Data CentreCI-2009 EAp2: Minimum Energy Performanceposted by Natalie Wong on Jan 20, 2012, 2:49 am
We are now working on the lighting fixtures in a data centre. Last reply: Marcus Sheffer, Feb 2, 2012, 10:56 am |
|
EPP certification for proof of recycled content?NC-2009 MRc4: Recycled Contentposted by Renee Shirey on Jan 19, 2012, 5:15 pm
Has anybody ever had an issue with using an... Last reply: Steve Loppnow, Feb 1, 2012, 7:16 pm |
|
Epoxy Flooring AgainNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Mary Kay on Dec 7, 2011, 3:11 pm
I have a product by Sherwin-Williams "Tile-Clad High Solids" w/ a... Last reply: Steve Loppnow, Feb 1, 2012, 7:11 pm |
|
paints for steel doorNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Adi Negara, LEED AP BD+C on Jan 19, 2012, 3:15 am
where do these kind of paints fall under the Product Type of Table 1. IEQc4.2 Applicable... Last reply: Steve Loppnow, Feb 1, 2012, 7:03 pm |
|
Space types included in IEQ 4 credits?NC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Timo Rintala on Jan 31, 2012, 6:44 am
Hi My questions conserns calculation of... Last reply: Steve Loppnow, Feb 1, 2012, 6:59 pm |
|
MERV 13 in residencesNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Iris Amdur on Dec 21, 2011, 5:20 pm
Has anyone submitted a residential project that has pursued the intent of the... Last reply: Dylan Connelly, Feb 1, 2012, 6:40 pm |
|
Mixed Use- Office/ ResidentialEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Lauren Wallace on Feb 1, 2012, 2:50 pm
My project contains 12 floors of commercial office space (95% occupied), a ground floor retail (100% occupied), and 30 stories of residential (30% occupied). As I understand it, we could easily... Last reply: Barry Giles, Feb 1, 2012, 3:32 pm |