Topic

Exemplary Performance in Stage 1

General forums
posted by Daniel Costantino on Feb 1, 2012, 8:19 am

Hello,

I am working on Stage 1 submittal templates and have noticed that some templates for credits which offer exemplary performance per the reference guide (e.g. GIB C4, GIB C14) do not...

Last reply: Meghan Bogaerts, Feb 1, 2012, 9:42 am

FTE/calc guidance for hospitality

NC-2009 WEp1: Water Use Reduction
posted by Tristan Roberts on Nov 9, 2011, 12:00 am

FYI, the November 2011 addenda has two additional pieces of guidance on WEp1 calcs that are especially useful for hospitality:
"For the purposes of the credit calculations, assume that...

Last reply: Udana Ratnayake, Feb 1, 2012, 2:17 am

90.1-2007 Table G3.1.1A for Additions and Alterations

NC-2009 EAp2: Minimum Energy Performance
posted by Evelyn Dicks, EI, CxA on Jan 31, 2012, 5:14 pm

Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations? I am working on a project renovating a...

Last reply: Marcus Sheffer, Jan 31, 2012, 5:30 pm

When is the normal period to submit for design review phase?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Yuthdanai Somjitchob on Jan 30, 2012, 2:29 am

We have been working on our first LEED project in Thailand. We have been involved in the project since the beginning. It will take roughly 2.5 years for building design and construction (1.5 year...

Last reply: Susann Geithner, Jan 31, 2012, 3:15 pm

Base model minimum efficiencies

NC-2009 EAc1: Optimize Energy Performance
posted by Ming Feng on Jan 31, 2012, 2:30 pm

Hi,
I have a question about baseline building HVAC minimum efficiency. For instance, system -3 PSZAC, according to ASHRAE 90.1 table 6.8.1 there are different minimum efficiencies...

Last reply: Marcus Sheffer, Jan 31, 2012, 2:57 pm

Completing Enhanced Cx Templates for Federal Projects

NC-2009 EAc3: Enhanced Commissioning
posted by Hsin-Yi Hsieh on Jan 19, 2012, 10:33 am

Many federal projects are design/build (DB) where the DB firm hires the Commissioning Authority (...

Last reply: jason schneider, Jan 31, 2012, 1:43 pm

time green cleaning needs to be in place

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Gita Nandan on Jan 24, 2012, 4:42 pm

I am wondering if we are applying this credit as an innovation credit for a NC project, if it needs to be in place before the tenants have moved in, or is there a window of time within which it...

Last reply: Steve Loppnow, Jan 30, 2012, 6:58 pm

Subdivivided, Previously Developed Land

General forums
posted by Sam Watters on Jan 30, 2012, 1:11 pm

Our project sits on a lot that was subdivided out from a larger parcel in the past. The original, combined lot, was about 50% paved and has two buildings on it, and continues to be used as a car...

Last reply: Eliot Allen, Jan 30, 2012, 1:33 pm

Form Now Available for Non-US Project Feedback on ACPs

General forums
posted by Deon Glaser on Jan 30, 2012, 10:19 am

Hello everyone! As promised, we finally have feedback forms for the LEED 2009 ACPs for Projects Outside the U.S. available for you on the USGBC website. LEED is built on the input and feedback we...

M&V case 2: System required to be monitored not installed

CI-2009 EAc3: Measurement and Verification
posted by Edwin Wealend on Jun 7, 2010, 10:14 pm

Hi,

We have a project where we are converting a warehouse into an office, it will have a site area > 75% of the building area, infact the whole...

Last reply: Luis Miguel Diazgranados, Jan 30, 2012, 10:18 am