Building Type not listed in Default Occupancy Table

NC-v4 LTc6: Bicycle facilities
posted by Tim Nabholz on Jul 29, 2017, 4:22 pm

I am working on a justice centre (court house) project here in Canada and am wondering which occupancy type to use. The closest building type listed in Appendix 2: Default Occupancy Counts would...

Last reply: Gail Vittori, Oct 29, 2018, 1:04 pm

Membrane Primer VOC – LEED V4 – Healthcare

Healthcare-v4 EQc2: Low emitting materials
posted by Rebecca Barr on Oct 24, 2018, 6:25 pm

Hi there, we are a fabricator and installer of architectural metal wall panel systems and I was looking for some insight into...

CS-v4 IPc1- Integrative Process (Design Charrette)

NC-v4 IPc1: Integrative process
posted by Estra Marku on Jul 12, 2018, 4:07 pm

trying to familiarize ourselves with LEED v4 at the time that I posted this forum. Thank you Tristan and Summer for clearing things up, I really appreciate your help. Log in or register to post comments ...

Last reply: Estra Marku, Oct 16, 2018, 6:15 pm

Achieving the certified level to earn RP credit points?

NC-v4 RPc1: Regional Priority
posted by Manuelle Croft on Jul 12, 2018, 8:37 am

With the LEED Canada 2009 versions, projects had to achieve the certified level prior to ean the Regional priority credit (RPc)points. 

I cannot find any statement in the reference guide...

Last reply: Tristan Roberts, Oct 15, 2018, 3:47 pm

Pilot Credit: INpc113- Informing Design Using Triple Bottom Line Analysis

NC-v4 INc1: Innovation
posted by Sophie Kerr on Sep 24, 2018, 4:44 pm

RETIRED LEEDuser Expert 622 thumbs up October 9, 2018- 12:36 pm Sophie - Your comment may have a better chance of being responded to if it is posted under the INpc113 forum-  https://leeduser.buildinggreen.com/node/add/forum?credit_id=4930&forum_id=4412&destination=forums. I hope other LEEDusers will share their experience. Log in or register to post comments ...

Last reply: RETIRED, Oct 9, 2018, 12:36 pm

Small Project BoD

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Claire Cowling on Sep 24, 2018, 1:26 pm

I picked up a project in my firm after the first review was compelted. It seems that a BoD was never created for this project, as it is very small and the...

HPD v2.1- Statement about Special Conditions when "No" is indicated for Characterized, Screened, or Identified

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Ashley Hu on Mar 20, 2018, 7:30 pm

I’m currently reviewing a HPD v2.1 for LEED v4 Building Product Disclosure and Optimization – Material Ingredient Option 1.

Just about everything on this particular HPD meets the...

Last reply: Tristan Roberts, Sep 20, 2018, 10:57 am

Reclaim and use steam condensate requirement for indoor water use reduction

NC-v4 WEc2: Indoor water use reduction
posted by Elyse Dufrene on Sep 11, 2018, 7:52 am

Can you please clarify what is ment by the requirement for steam system : reclaim and use condensate  - 100% recovery and...

Last reply: emily reese moody, Sep 19, 2018, 6:30 pm

Finding an auditor

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Joanne Sawatzky on Sep 13, 2018, 3:58 pm

Hi,

Do any of you have a recommendation on where to find a 3rd-party...

DES boilers accountable for water metering

NC-v4 WEc4: Water metering
posted by Elyse Dufrene on Sep 11, 2018, 8:00 am

If...