Log in
Forum » Middle East
Loading...
Topic

LEED Preferred Parking

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Saud Abdul Rasheed on Oct 15, 2015, 6:39 am

Hi all,
We have received our Final Design Review and the credit has been denied. Now we want to appeal for the credit as the client is willing to provide Low Emitting and Fuel Efficient...

Last reply: Saurabh Shrestha, Nov 30, 2015, 7:20 pm

Single family homes- compliance with Energy Star and Checklists

ND-v2009 GIBp2: Minimum building energy efficiency
posted by Mahesh M on Nov 20, 2015, 10:15 am

We are evaluating the possibility of pursuing LEED ND for a development in the middle east. The project consists predominantly of single family and low-rise residential units. The residential...

Last reply: Casey Studhalter, Nov 30, 2015, 12:02 pm

Regularly Occupied Space Area Calculation

NC-2009 PIf3: Occupant and Usage Data
posted by ESRA OZKONUKSEVER on Nov 27, 2015, 8:38 am

Dear All,
While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces?
Thank you!

Last reply: Jon Clifford, Nov 27, 2015, 2:14 pm

Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Aly Adel on Jan 6, 2015, 11:00 am

Hello!
We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only). At this time, they were not considering LEED as an...

Last reply: Tristan Roberts, Nov 26, 2015, 10:46 pm

SRI Value for concerete

NC-2009 SSc7.2: Heat island effect - roof
posted by soha yamani on Aug 19, 2015, 7:15 am

Is there a standard...

Last reply: Tristan Roberts, Nov 26, 2015, 5:32 pm

Using Recycled Water for Irrigation

NC-v4 WEp1: Outdoor water use reduction
posted by Abdulrahman Sherazy on Nov 18, 2015, 3:15 am

Hello everybody. In our project we do not have outdoor water use except for irrigation. Knowing that only the municipality recycled water is used for irrigation, does this secure 2 points of the...

Last reply: Abdulrahman Sherazy, Nov 22, 2015, 1:40 am

Concerning Underground Basements

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Omar ElRawy on Sep 17, 2015, 5:03 am

Dear all,
My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area....

Last reply: Michael DeVuono, Nov 11, 2015, 3:56 pm

Clarification for Saudi Arabia regional priority credit

NC-2009 MRc2: Construction Waste Management
posted by Daoud Akeileh on Nov 8, 2015, 4:41 am

The MRc2: Construction waste management credit is a regional priority credit in UAE one of the Saudi Arabian country eastern boundary and the Saudi Arabia is not one of the listed countries for...

Last reply: Michelle Reott, Nov 11, 2015, 12:05 pm

Clarification for Saudi Arabia regional priority credit

NC-2009 MRc2: Construction Waste Management
posted by Saudi Binladen group on Nov 9, 2015, 10:51 am

The MRc2: Construction waste management credit is a regional priority credit in UAE one of the Saudi Arabian country eastern boundary and the Saudi Arabia is not one of the listed countries for...

Last reply: Saud Abdul Rasheed, Nov 9, 2015, 11:42 pm

IEQc6.1- space type category

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by S. Sachs on Oct 27, 2015, 8:07 am

For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category?

Last reply: Gustavo De las Heras Izquierdo, Nov 4, 2015, 10:21 pm